Similar Projects
Last Updated | 10/07/2022 01:36 PM |
Project Title | General Billy Mitchell ANGB, WI Hydrant Fuel System Replacement |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53207 (Milwaukee County) |
Category(s) | Commercial, Heavy and Highway |
Sub-Category(s) | Gas Station, Site Development, Vehicle Sales/Service |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $35,159,500 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | General Billy Mitchell ANGB, WI Hydrant Fuel System - This project includes an enclosed DoD Type III Hydrant Fueling Pumphouse with control room, two above ground 5,000 barrel fuel operating storage tanks with containment and the infrastructure for the Automatic Tank Gauging Equipment, filter building, distribution piping to existing loop, a new product recovery tank, extension of a fuel transfer line and associated site work. The estimated construction cost of this project is more than $10,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |