Similar Projects
Systemwide CCTV Camera & Ramp Queue Detection Installation
Term Contract
Sub-Bidding
Downers Grove, IL 60515

Moving Services
Term Contract
Sub-Bidding
Woodridge, IL 60517

Mosquito Abatement Services
Alteration
Post-Bid
Downers Grove, IL

Rental/Service of Portable Toilets for Various City Divisions
Alteration
Post-Bid
Aurora, IL

Aerial Spraying of Aquatic Glyphosate Herbicide
Term Contract
Results

Classroom Locksets
Term Contract
Results
$199,600 CJ est. value
Naperville, IL 60540

Paragon Rubber Bullet Trap Cleaning
Term Contract
Sub-Bidding
Glen Ellyn, IL 60137

Job Order Contracting
Term Contract
Post-Bid

Snow and Ice Removal Services for City Sidewalks
Term Contract
Results
$6,450 CJ est. value
Wheaton, IL 60187

Equipment For Bid
Term Contract
Sub-Bidding
Wheaton, IL 60187

Water System Leak Detection Services
Term Contract
Post-Bid
Woodridge, IL 60517

Snow and Ice Removal Services for Parking Lots and Garages
Term Contract
Results
Wheaton, IL 60187

Sanitary Sewer Cleaning and Televising
Term Contract
Sub-Bidding
Woodridge, IL 60517

Electrical Work for the Health Department
Term Contract
Post-Bid
Wheaton, IL 60187

Streetlight Maintenance Services
Term Contract
Results
$62,408 CJ est. value
Lisle, IL 60532

Last Updated 05/23/2023 07:05 AM
Project Title

Sign Shop Supplies

Physical Address View project details and contacts
City, State (County) Wheaton, IL 60187   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Bidder must be capable, either as a firm or a team, of providing all services as described under Specifications and/or Scope of Work Section and to maintain those capabilities until notification of the fact that their Bid was unsuccessful. The selected Bidder must remain capable of providing all services proposed as described under Specifications and/or Scope of Work Section and must maintain those capabilities until the agreement is successfully finished. The successful Bidder will be responsible for all Services in this Bid as they are provided or performed by the Successful Bidder. Further, the County will consider the Successful Bidder(s) to be the sole point of contact with regard to contractual matters, including payment of any and all charges resulting from the cost of any contract. May 30, 2023 4:00 p.m. CT Questions due to Buyer via email: Nickon.Etminan@dupageco.org Prevailing rate of wages as determined by the County of DuPage or the Illinois Department of Labor may apply to some or all work performed on this contract and paid to all laborers, workers and mechanics performing work under this contract Bidder may withdraw the bid at any time prior to the time specified as the closing time for the receipt of bids. However, no Bidder shall withdraw or cancel the bid for a period of ninety (90) calendar days after said closing time for the receipt of bids. Unauthorized withdrawal may result in forfeiture of the bid bond, or if no bid bond is required, the withdrawing Bidder shall pay the sum of $1,000.00 as liquidated damages for the County's loss in re-bidding. The County reserves the right to reject any or all Bids, or to accept or reject any Bid in part, and to waive any minor informality or irregularity in Bids received, if it is determined by the Procurement Officer or designee that the best interest of the County will be served by doing so. The County may reject any Bid from any person, firm or corporation in arrears or in default to the County on any contract, debt, or other obligation, or if the Bidder is debarred by the County from consideration for a contract award, or if Bidder has committed a violation of the ethics or anti-kickback provisions of the County's Procurement Ordinance which resulted in a termination of a contract or other material sanction within the two (2) years immediately preceding the date of issuance of this document.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents