Similar Projects
Upper Mormon Slough Critical Erosion Repair
Infrastructure
Bidding
$5,387,900 to $6,136,214 est. value
Escalon, CA 95320

PW Pedestrian Safety Improvements
Infrastructure
Bidding
$900,000 est. value
San Francisco, CA 94158

Compost Leachate Pond Improvements
Renovation
Post-Bid
$1,900,000 est. value
Auburn, CA 95603

Levee Maintenance Project
Infrastructure
Post-Bid
Stockton, CA 95214

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Bidding
$16,200,000 est. value
CA

Citywide Flood Protection Maintenance
Infrastructure
Post-Bid
Paso Robles, CA

County Roadway Drainage Improvement Project
Infrastructure
Results
CA

Replace Drainage Pumps
Infrastructure
Bidding
$6,400,000 est. value

ADP Airside Improvements
New Construction, Renovation, Infrastructure, Alteration
Post-Bid
$270,000,000 est. value
San Diego, CA

Outfall Channel and Instrumentation Improvements
Infrastructure
Results
$4,180,435 est. value
San Jose, CA 95134

Construct Soldier Pile Wall
Infrastructure
Bidding
$1,750,000 est. value
CA

Construct Unlined Ditch in Contra Costa County
Infrastructure
Post-Bid
$65,000 est. value
Hercules, CA 94547

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Reported 09/08/2021 12:00 AM
Project Title

American River Common Features 2016 Erosion Protection Project

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95814   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all personnel, equipment, supplies, portable facilities, transportation, tools, materials, supervision, necessary permits, and other items and nonpersonal services necessary to perform the tree removal and trimming, and elderberry transplanting defined in this Performance Work Statement (PWS). The overall responsibility of the Contractor is to manage and perform the activities necessary to complete the work described in this PWS and the Drawings (Exhibit A). Services include, but are not limited to planning, coordinating, organizing, managing, and performing the following services: - Acquiring permits - Clearing - Transplanting elderberry shrubs - Preparing mitigation sites for planting - Planting mitigation sites - Irrigating mitigation sites - Performing weed control - Controlling herbivore browse - Documenting work - Monitoring plant survival rates - Keeping sites clean and organized - Removing mitigation site establishment infrastructure at end of contract

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents