Similar Projects
Last Updated | 10/18/2023 08:36 AM |
Project Title | Siphon 7 Improvements Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Conroe, TX 77301 (Montgomery County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $880,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The SJRA Highlands Division delivers raw water to multiple municipal, industrial, and irrigation customers through the maintenance and operation of three pump stations, 27-miles of canal, a 1400-acre reservoir, and over 60 siphons and culverts. Highlands Siphon 7 Improvements Phase 2, hereafter called "Project" is located at the intersection of the SJRA Main Canal and FM 2100 in Crosby, Texas. Individual who has full-time employment as a peace officer is one who is actively employed in a full-time capacity as a peace officer working, on average, a minimum of 32 paid hours per week, being paid a rate of pay not less than prevailing minimum hourly wage rate set by federal Wage and Hour Act and entitled to full benefits of participation in retirement plan, vacation, holidays, and insurance benefits. A reserve peace officer does not qualify, under this definition, as a peace officer. Owner's Representative reserves the right to require proposed product to comply with colour and pattern of specified product if necessary to secure design intent. After areas to receive topsoil have been brought to grade, and immediately prior to dumping and spreading topsoil, loosen subgrade by discusing or by scarifying to a depth of at least 2 inches to permit bonding of topsoil to subsoil. Compact by passing bulldozer up and down slope, tracking over entire surface area of slope to create horizontal erosion control slots. All questions and inquiries about this Solicitation shall be submitted using the EMarketplace System site or during the Pre-Proposal Conference, if applicable. The deadline for written questions is 11:00 AM CST on October 16, 2023 Any questions submitted via the E-Marketplace System website shall be equivalent of contacting the SJRA Purchasing Department directly. Interpretations or clarifications considered necessary by Owner in response to such questions will be issued by Addenda and posted on the E-Marketplace System website |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |