Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

RFP - HVAC Repair and Maintenance Services
Term Contract
Bidding
Chicago, IL 60616

Filters
Term Contract
Sub-Bidding
Palatine, IL 60074

HVAC Upgrades Project - Bid Group No. 1 Bid Package 01
Renovation
Sub-Bidding
$600,000 CJ est. value
Berwyn, IL 60402

Replacement of Rooftop HVAC Units
Alteration
Post-Bid
Chicago, IL 60612

Air Filters
Alteration
Post-Bid
$70,000 est. value
Chicago, IL

Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Results
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Des Plaines HVAC Improvements
Results
Des Plaines, IL

Pleasantdale Schools RTU (Roof Top Unit) Replacement Project
Renovation
Sub-Bidding
$300,000 CJ est. value
La Grange, IL 60525

HVAC Maintenance
Term Contract, Alteration
Post-Bid
Morton Grove, IL

Morton College Building E - HVAC
Renovation
Results
Less than $100,000 est. value
Cicero, IL 60804

Desiccant Dehumidification System
Renovation
Sub-Bidding
$60,000 CJ est. value
Evanston, IL 60201

Central Community Center - RTU Replacement (Units 6, 8, 11)
Alteration
Post-Bid
Mount Prospect, IL 60056

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

HVAC Maintenance - Chicago Facilities
Term Contract
Sub-Bidding
Chicago, IL 60604

Last Updated 12/05/2022 07:17 PM
Project Title

Henry Elementary School - Steam Coils and Blower Housing Replacement

Physical Address View project details and contacts
City, State (County) Chicago, IL 60618   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $169,752 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Henry ES- Steam Coils and Blower Housing Replacement Various Trades Prequalified Vendors Only Questions Due Date: Oct 20th 2022, 1:30 PM CDT Coil Replacement Demo all old vertical steam coils. Fabricate and install a new steel frames to accept new style steam coils. Provide and install [10] new steam coils sized to match the existing footprint. (North side blower has 4 preheats and 4 reheats south side blower has 1 preheat and 1 reheat.) Connect to the existing supply and return piping. Flash around the new coils with galvanized sheet metal. Vendor to provide any mechanical tools/equipment necessary for project completion. Test and verify operation. All work to be conducted in accordance with CPS Specifications. Haul all debris and dispose of daily. Blower Bottom Pump out bottom of blower housing and remove any debris from pit. Supply and install new galvanized 18-gauge steel for bottom and side of blower housing. Wrap sides and bottom with new steel and weld pieces together in place. Seal top side of new pan to existing sheet metal. Vendor to provide any mechanical tools/equipment necessary for project completion. Test and verify operation. All work to be conducted in accordance with CPS Specifications. Haul all debris and dispose of daily.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents