Similar Projects
Edgewood Road Trail Phase 2B - Bridge Modifications and Trail
Conception
$4,060,000 est. value
Cedar Rapids, IA 52407

Shaver Road Bridge and Floodwall, Phase 4
Conception
$1,500,000 est. value
Cedar Rapids, IA 52402

East Street Stabilization Project
Infrastructure
Bidding
$120,000 est. value
Van Meter, IA 50261

Bridge Replacement on Conrad Lane
New Construction, Infrastructure
Bidding
$200,000 est. value
Bankston, IA 52045

Camp Dodge Training Area Bridge Replacement
Renovation
Post-Bid
Johnston, IA

Bridge Replacement - CCS
New Construction, Infrastructure
Post-Bid
IA

West Des Moines Digital Enterprise Segment 5-3 Raccoon River Crossing
New Construction
Results
West Des Moines, IA

J Street SW Bridge Over Prairie Creek Repairs
New Construction
Results
$25,000 est. value
Cedar Rapids, IA 52404

Steel Girder Repair
New Construction, Renovation, Infrastructure
Bidding
$200,000 est. value
Sidney, IA

Bridge Replacement on Hickory Valley Road
New Construction, Infrastructure
Post-Bid
IA

Bridge Replacement with Twin RCB - BR 1270
New Construction
Results
Less than $375,000 est. value
Polk City, IA

Bridge Replacement on North Bankston Road
New Construction, Infrastructure
Post-Bid
IA

2021 Bridge Repair
Renovation, Infrastructure
Results
Webster City, IA 50595

Cedar Valley Nature Creek Trail - Fishel Road Bridge Replacement
Renovation, Infrastructure
Post-Bid
$91,000 est. value
IA

Booneville Road Bridge Over Johnson Creek
New Construction
Results
$1,461,000 est. value
West Des Moines, IA 50266

Last Updated 04/20/2022 03:35 PM
Project Title

2nd Avenue Bridge over the Des Moines River Rehabilitation and 2nd Avenue Bridge over Birdland Drive Replacement

Physical Address View project details and contacts
City, State (County) Des Moines, IA 50982   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Bridge, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents