Similar Projects
Lauderdale County Agricultural Events Center - Remaining Trades Pkg - Vertical Construction
New Construction
Design
$45,000,000 est. value
Florence, AL 35634

Bryant-Denny Stadium Turf Replacement
Renovation, Infrastructure
Bidding
$800,000 CJ est. value
Tuscaloosa, AL 35401

Track Resurfacing, Turf Replacement and Drainage Improvements
Infrastructure
Bidding
$70,000 CJ est. value
Bessemer, AL 35022

New Press Box at the Georgiana High School Football Stadium
New Construction
Post-Bid
$8,200,000 est. value
Georgiana, AL 36033

Jordan-Hare Stadium - Restoration and Maintenance for 2021-22
Renovation
Post-Bid
Auburn, AL 36849

Legion Field World Games Renovations
Renovation
Results
$740,000 est. value
Birmingham, AL 35204

Stadium Improvements to Francis Marion High School
Renovation
Results
Marion, AL 36756

Stadium Improvements
Construction
$1,588,000 est. value
Jemison, Maplesville, Verbena, AL 36091

New Football Stadium for Vigor High School
New Construction
Construction
$5,497,771 est. value
Mobile, AL 36610

Williamson High School Football Stadium - Mobile County Board of School Commissioners
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Mobile, AL 36605

Garrett Coliseum Renovations Bid Package No. 2 - Exterior Fenestration
Renovation
Bidding
$400,000 CJ est. value
Montgomery, AL 36107

New Football Press Box for Loachapoka High School
New Construction
Post-Bid
$360,000 est. value
Auburn, AL 36832

Joe Davis Stadium Renovation
Renovation
Results
$29,353,889 est. value
Huntsville, AL 35801

New Football Stadium to Leflore High School
New Construction
Construction
$5,038,882 est. value
Mobile, AL 36617

Softball Field Dugout and Pressbox Renovation for Russellville High School
Renovation
Post-Bid
$600,000 est. value
Russellville, AL 35653

Last Updated 12/27/2022 11:04 AM
Project Title

Amphitheater - City of Alabaster

Physical Address View project details and contacts
City, State (County) Alabaster, AL 35007   (Shelby County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.shelbycountyreporter.com/2022/12/09/alabaster-city-council-approves-survey-work-for-next-step-in-amphitheater-project/ ALABASTER - Members of the Alabaster City Council approved an agreement with surveyors for its new amphitheater project. At the Nov. 28 meeting, councilmembers voted to approve Engineering Design Group to perform survey work that will be needed for the new amphitheater project, which will be located next to the historic water tower at city hall. The agreement is not to exceed $28,000, and city officials anticipate having the design portion of the project finalized in spring 2023, at which point they will be able to bid out the actual construction of the project. Earlier this year, the city voted to approve an architecture firm to design a new amphitheater and stage. The venue, located at the municipal green, which is located near city hall and the Alabaster Senior Center, will create an event space for smaller functions. Plans for the space could include tiered seating levels, a stage with rigging for lighting and equipment, a loading and unloading area and a green room for performers. There will also be a small addition to the Senior Center to allow for a more general purpose meeting event space. Officials with the city said once completed, the project will offer a picturesque location for community events for the public to enjoy. ____________________________________________________________________________________________________________________________________ A multipurpose amphitheater on the grounds of the city municipal complex to host various concerts, performances, and events. This project is in included in the City of Alabaster 2022-2023 Capital Improvement Plan (CIP). As of October 6, 2022, information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents