Similar Projects
FY23-FY24 Large Water Meter Vaults and Associated Delivery Services
Infrastructure
Bidding
GA

FY23-FY24 New Water Meter Installations
Infrastructure
Bidding
$400,000 est. value
Marietta, GA

Prequalification Of Contractors for The Period 2021-2022
Post-Bid
Marietta, GA

Pre-Qualifying Pipeline Contractors
Infrastructure
Post-Bid
GA

Materials for South Cobb Drive Waterline Project
Results
Smyrna, GA 30080

Fy22 Miscellaneous Water Main Replacements
Results
Marietta, GA

FY23 UPC for Water, Sewer, and Miscellaneous Services
Infrastructure
Bidding
Marietta, GA

Materials For San Fernando Drive Waterline Project
Infrastructure
Post-Bid
Smyrna, GA

Wilderness Way Two Way Water Feed
Results
GA 30066

FY23-FY24 Large Water Meter Testing and Calibration Services
Infrastructure
Bidding
Marietta, GA

2023 Blow-Off Replacements
Infrastructure
Post-Bid
$2,000,000 est. value
Marietta, GA

Fire Hydrant Testing and Maintenance
Term Contract
Results
$135,000 est. value
Acworth, Austell, Kennesaw, Mableton, Marietta, Powder Springs, Smyrna, GA 30127

Annual Contract - Full Service Maintenance Agreement for Valves and Actuators
Term Contract
Post-Bid
Marietta, GA

Indian Trail Water System Improvements
Results
$925,076 est. value
Marietta, GA

Annual Contract - Fire Hydrant Inspection and Maintenance
Term Contract
Results
Acworth, Austell, Kennesaw, Mableton, Marietta, Powder Springs, Smyrna, GA 30008

Reported 07/06/2022 12:34 PM
Project Title

Lockheed Martin Wastewater Tie-On Modified - Phase 1

Physical Address View project details and contacts
City, State (County) Marietta, GA 30060   (Cobb County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of sanitary sewer pipes and 4 manholes. As of April 1, 2022, this project is seeking approval from Cobb County. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed, but construction could begin in fourth quarter 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents