Similar Projects
Founder’s Classical Academy of Prosper
Post-Bid
Prosper, TX 75078

Contracted Services (Maintenance and Operations)
Post-Bid
Prosper, TX 75078

Community Middle School Renovation
Renovation
Results
Nevada, TX 75173

Kitchen Renovations/Serving Lines at Saigling, Shepard, Andrews, Hickey Elementary School and Schimelpfenig Middle School
Renovation
Results
$1,575,900 est. value
Plano, TX 75074

Prestonwood Christian Academy
Addition
Construction
Plano, TX 75093

New Gymnatorium
New Construction
Construction
McKinney, TX

Kitchen Remodel
Renovation
Post-Bid
Frisco, TX 75034

Construction Manager at Risk Services for Multiple Projects
New Construction, Addition
Results
$325,300,000 est. value
Prosper, TX 75078

New Frisco High School Softball Locker Room
Addition
Construction
$1,441,000 est. value
Frisco, TX 75035

Additions and Renovations to the Harrison Intermediate, Bush Elementary, and Cox Elementary Campuses
Renovation, Addition
Post-Bid
Wylie, TX 75098

Concession Stand with Restrooms at the Bland High School Sports Facility
Results
Farmersville, TX 75442

Melissa High School Phase 2
Addition
Construction
Melissa, TX 75454

Wylie East Intermediate School
Post-Bid
Wylie, TX 75098

Design/Build for a New Field House for the Blue Ridge Independent School District
New Construction
Results
Blue Ridge, TX

Frisco High School #12
Construction
Frisco, TX 75035

Reported 02/05/2021 12:00 AM
Project Title

Plano ISD - T H Williams High School Renovations

Physical Address View project details and contacts
City, State (County) Plano, TX 75074   (Collin County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding, Construction Start Expected March 2021
Bids Due View project details and contacts
Estimated Value $14,000,000
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Major interior renovations to include a new administration suite, new counselor suite, new special education suite, and new art labs.

Details

81,400 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents