Similar Projects
2022 Curb Ramps - II
Infrastructure
Bidding
$80,000 est. value
Erie, PA

Area Rehab - Replace Marina Docks
Infrastructure
Bidding
$1,000,000 est. value
Erie, PA 16505

North East Borough Handicapped Accessible Curb-Cut Ramps Project
Post-Bid
North East, PA

Memorial Park Playground Asphalt Parking and Accessible Walkways Project
Infrastructure
Post-Bid
Erie, PA

Sidewalk Accessibility Project - Phase IX
Results
$171,555 est. value
Erie, PA

Edinboro Borough Handicapped Accessible Curb-Cut Ramps Project
Results
Edinboro, PA 16412

Memorial Park Playground Asphalt Parking and Accessible Walkways Project
Renovation, Infrastructure
Post-Bid
Erie, PA 16511

Oliver Road Sidewalk Project
Results
Erie, PA

North East Borough Handicapped Accessible Curb-Cut Ramps Project
Infrastructure
Post-Bid
North East, PA

Sidewalk & ADA Project
Results
Fairview, PA 16415

Restoration of Sidewalks, Curbs and Driveways
Infrastructure
Post-Bid
Erie, PA 16511

2021 Curb Ramps - I
Infrastructure
Results
$57,583 est. value
Erie, PA

Pavement, Walk and Curb Replacement at the Strong Vincent Middle School
Infrastructure
Results
Erie, PA 16502

2021 Curb Ramps - II
Infrastructure
Results
Erie, PA

Chelsea Avenue Sidewalk Project
Infrastructure
Results
$180,000 est. value
Erie, PA 16505

Last Updated 07/12/2022 12:41 AM
Project Title

Sidewalk Replacement Project - Phase I

Physical Address View project details and contacts
City, State (County) Erie, PA 16506   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids are invited for the following: Removal and replacement of approximately 3,410 LF of sidewalks along both the east and west side of Berkeley Road from West 32nd Street to West 26th Street (SR 20). The new ADA compliant sidewalks shall be 5-feet in width and 4-inches thick and through the driveways it will be 6-inches thick with mesh. Any driveways that are altered will have an apron to the road surface installed. Bid will also include all restoration. All sidewalks, aprons and safety barricading of sidewalk under construction must be in compliance with the Americans with Disabilities Act and the 2011 Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way, published in the Federal Register for public comment on July 26, 2011. Bidder will supply a separate Lump Sum price along with an item breakdown.Each bid must be accompanied by a bid guarantee in the form of a certified or cashier's check or bid bond with corporate surety payable to Millcreek Township in an amount equal to ten percent (10%) of the bid price.Millcreek Township reserves the right to reject any or all bids or to waive any informalities or minor deviations in the bidding.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents