Similar Projects
Last Updated | 06/22/2023 01:35 AM |
Project Title | Repair of Stack Breaching for Three Boilers at Clinton Correctional Facilitys Powerhouse |
Physical Address | View project details and contacts |
City, State (County) | Dannemora, NY 12929 (Clinton County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $55,630 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Repair of stack breaching for three boilers at Clinton Correctional Facility's Powerhouse. Facility Located in Dannemora, New York (Clinton County). Repair will include removal of existing insulation/jacket from the top of the breaching duct. Re-insulation of breaching duct with new mineral wool and alumaguard wrap to preserve and protect failure. Contractor will be required to provide their own 120 Foot Articulating Lift. Service-Disabled Veteran-Owned Set Aside: 6% Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Contract term: 1 year All questions should be submitted in writing no later than 04/28/2023, citing the particular bid section and) paragraph number. The prospective bidder should notify the DESIGNATED CONTACT of any term, condition,) etc. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |