Similar Projects
Pegasus Equestrian-Centered Resort
New Construction, Infrastructure
Conception
$90,000,000 CJ est. value
Oakland, OR 97462

Douglas Avenue Improvements - City of Roseburg
Infrastructure
Conception
$700,000 CJ est. value
Roseburg, OR 97470

I-5: Exit 125 Northbound at Garden Valley Blvd
Infrastructure
Design
$2,200,000 CJ est. value
Roseburg, OR 97470

OR 38: Hinsdale Slough Culvert
Infrastructure
Design
$1,431,000 CJ est. value
Elkton, OR 97436

CM/GC for Emergency Management Facility Remodel Project
Addition, Demolition, Build-out, Infrastructure
Bidding
$4,325,000 CJ est. value
Roseburg, OR 97470

Pavement Management Program - Slurry Seals 2023
Infrastructure
Bidding
$486,000 CJ est. value
Roseburg, OR 97470

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Douglas High School Culinary Classroom
New Construction, Infrastructure - 970 SF
Post-Bid
$908,000 CJ est. value
Winston, OR 97496

OR138E Glide Restriping and RRFB Project
Infrastructure
Results
$338,833 CJ est. value
Roseburg, OR 97470

OR42: Lookingglass to Benedict / US199: Applegate to CA Border
Infrastructure
Results
$6,656,504 CJ est. value
Roseburg, OR 97470

City of Myrtle Creek - Riverside Pump Station
Demolition, New Construction, Infrastructure
Construction
$1,494,900 CJ est. value
Myrtle Creek, OR 97457

City of Myrtle Creek - Riverside Pump Station
Demolition, New Construction, Infrastructure
Construction
$1,494,900 CJ est. value
Myrtle Creek, OR 97457

Taxiway A Extension - City of Roseburg
Infrastructure
Conception
$1,400,000 CJ est. value
Roseburg, OR 97470

RFP D/B - Glide Schools Design-Build Playground Cover
Infrastructure
Design
$325,000 CJ est. value
Glide, OR 97443

(District 7) Drainage Modifications
Infrastructure
Post-Bid
$300,000 CJ est. value
Sutherlin, OR 97479

Last Updated 04/24/2023 01:34 PM
Project Title

Vine Street Main Replacement and Hooker Road Main Extension

Physical Address View project details and contacts
City, State (County) Roseburg, OR 97470   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $309,735 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 24, 2023, this project has not yet been awarded. A timeline for award has not yet been established.* Project Description: The work contemplated consists of constructing approximately 1,765 linear feet of 8-inch diameter potable water distribution main in two project locations. Approximately 565 linear feet of 8-inch ductile iron water main, two hot tap connections, eight (8) dual service connections, and one (1) fire hydrant assembly will be constructed on Vine Street. Approximately 1,200 linear feet of 8-inch ductile iron water main, three (3) single service connections, two (2) dual service connections, and one (1) fire hydrant assembly will be constructed on Hooker Road. Both projects will include connections to existing distribution systems, abandonment of existing water distribution piping, surface restoration, pavement restoration, traffic control, together with appurtenant valves and related work, and the performance of any other work as called for by the project plans and specifications. Address Technical Questions to: Daryn Anderson, P.E. 900 SE Douglas Ave. Roseburg, OR 97470 (541) 492-6885 danderson@cityofroseburg.org Bidders must be pre-qualified in accordance with the laws of Oregon and the Information to Bidders at least ten days prior to the date of bid opening, Bidders must be licensed with the Oregon Construction Contractors Board and comply with City of Roseburg Municipal Code. The resulting public works contract is subject to ORS 279C.800 to 279C.870 or the Davis-Bacon Act (40 U.S.C. 3141 to 3148). No bid will be considered unless the bid contains a statement that the bidder will comply with the provisions of ORS 279C.840 (Prevailing Wage Rates). Any and all bids received after the 2:00 p.m. deadline for submission, or for which the list of first-tier subcontractors has not been submitted by 4:00 p.m. that same day, shall be considered nonresponsive and returned to the bidder. All bidders must list their "Construction Contractors Board" or "State Landscape Contractors Board" license number as required by ORS 701.021 or 671.530 on the bid form. The City of Roseburg may reject any bid not in compliance with all public bidding procedures and requirements, including the requirement to demonstrate the bidder's responsibility under ORS 279C.375(3)(b), may waive any irregularities, and may reject for good cause any or all bids upon a finding of the City it is the public interest to do so. The City may also cancel this invitation in accordance with OAR 137-049-0270. the Contractor shall file with the Construction Contractors Board, a Public Works Bond in the amount of $30,000 with a corporate surety authorized to do business in the State of Oregon. Question Deadline 03/04/2023

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents