Similar Projects
Underground Storage Tank System Removal at the ESC
Post-Bid
Clinton Township, MI 48038

Water Storage Distribution System (WSDS)
Post-Bid
Detroit, MI

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Underground Storage Tank System Removal
Infrastructure
Post-Bid
Farmington, MI 48336

Elkton Water Storage Tank Repairs and Painting
Results
Less than $260,000 est. value
Elkton, MI

Underground Storage Tank Removal and Above Ground Tank Install
Infrastructure
Post-Bid
Delton, MI

2021 Rehab of Brigden Tanks
Results
Battle Creek, MI

Replace Underground Water Tank - Sleeper State Park
Infrastructure
Post-Bid
Caseville, MI 48725

Water Treatment Plant Storage Tank Improvements
Results
Big Rapids, MI

Walled Lake-Novi WWTP Treatment Tank Improvements - Phase 2
Infrastructure
Post-Bid
Novi, MI 48377

150,000 Gallon Water Tank and Scada Improvements, Contract B
Results
Vermontville, MI

Repairs and Painting of the 250,000 Gallon Elevated Water Storage Tank
Infrastructure
Post-Bid
$180,000 est. value
Richland, MI

Contract 1 - Water Tower Improvements
Results
McBain, MI

UST Removal and Site Remediation
Results
Detroit, MI 48213

Last Updated 03/09/2022 01:44 AM
Project Title

Repairs and Painting the 250,000 Gallon Elevated Storage Tank

Physical Address View project details and contacts
City, State (County) Capac, MI   (Saint Clair County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: 1 Lump Sum Abrasive Blast the Exterior in a Dust Tight Containment 1 Lump Sum Spot Clean the Coating Failures in the Dry Interior and Spot Repair 1 Lump Sum In the Wet Interior, Address below and above the high-water level coating deterioration on the sidewalls, bowl, access tube and caulk the lap seams 1 Lump Sum Install Supports at the Painters Railing Butt Joints 1 Lump Sum Replace the Damaged Light Fixtures in the Dry Interior 1 Lump Sum Install a Cover over the Opening in the Top Platform 1 Lump Sum Modify the Overflow Pipe Discharge 1 Lump Sum Cleanup & Restoration

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents