Similar Projects
Installation of Phase Failure Relay Monitoring Equipment
Renovation
Bidding
$70,000 CJ est. value
Stow, MA 01775

Route 38 Intersection Improvements
Infrastructure
Sub-Bidding
$3,161,000 CJ est. value
Lowell, MA 01850

Traffic Signal Upgrades for 34 Intersections, 2023
Infrastructure
Sub-Bidding
$205,000 CJ est. value
North Waltham, MA 02452

Wastewater Treatment Facility Phase 2 Upgrades
Alteration
Post-Bid
$11,600,000 est. value
Hudson, MA

Substation 4 Transformer Testing & Repairs
Alteration
Post-Bid
Reading, MA

Well 4 Water Treatment Plant Upgrades - Phase 1 - Sub Bid
Renovation
Results
$7,292,036 CJ est. value
Maynard, MA 01754

On-Call Electrical Services
Term Contract
Results
$100,000 est. value
Lowell, MA

Audio Visual Package for Fairbank Community Center
Renovation
Sub-Bidding
$450,000 CJ est. value
Sudbury, MA 01776

Electric Utility Construction Services
Infrastructure
Post-Bid
$200,000 CJ est. value
Belmont, MA 02478

Generator Maintenance & Service
Alteration
Results
Waltham, MA

Central School HVAC Upgrades- Sub
Renovation
Sub-Bidding
$900,000 CJ est. value
Arlington, MA 02476

On-Call Electrical Services
Alteration
Post-Bid
Malden, MA

Switchgear Replacement and Warehouse Power Feed Installation at the Driscoll Building Complex
Alteration
Results
$1,968,000 est. value
Weston, MA

Supply and Install Holiday Lights
Infrastructure
Sub-Bidding
$225,000 CJ est. value
Everett, MA 02149

On-Call Electrical Services
Term Contract
Post-Bid
$50,000 est. value
Melrose, MA

Last Updated 10/24/2023 05:37 PM
Project Title

Installation of Emergency Generator and Related Equipment

Physical Address View project details and contacts
City, State (County) Hudson, MA 01749   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $81,800 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of New Electrical Panel and Emergency Generator. All questions / clarifications shall be submitted in writing to cfonseca@hudsonlight.com no later than Monday, September 21, 2023. Answers to submitted questions shall be provided to all bidders as an addendum and shall be posted in Public on September 25, 2023. Hudson Light and power is installating a new emergency generator and related equipment Scope of Work: The Contractor will provide a minimum of the following service and materials but not limited: 1. Contractor is responsible for trenching from the existing transformer to the Hudson Light and Power office with new conduit to feed and spare conduit to feed the new electrical panel. Contractor shall provide a drawing depicting the required conduits and their uses and shall receive approval from Hudson Light and Power engineer prior to installation. 2. Contractor will be responsible for removal of the existing soil to allow the new conduit to be installed in the trench. Contractor is responsible for placing soil on clean plastic next to the trench. Contractor shall use the soil on the plastic to backfill the trench after the new conduit is installed. Contractor shall be responsible for the installation of clean fill if needed to finish off the conduit and trench rehabilitation. Contractor shall be responsible for seeding the construction area to bring back area to a condition before construction took place. Contractor shall dispose of all excess soil. 3. Contractor is responsible for supplying new conductors to the utility room. Contractor is responsible for making all connections in the utility room. (Emergency Generator, ATS, and related equipment to access the existing utility room for the installation of the new feed to the new electrical panel. 4. The Hudson Light and Power Department requires all work to be performed in a clean, safe, and professional manner. If the duration of work extends beyond one day, the work area will be rendered safe at the end of each day by the contractor, this could include the installation of safety tape and or highway plates to cover the excavations 5. Supply and install one (1) 600 AMP 277/480-volt three (3) phase four (4) wire underground service from the existing pad mount transformer to the Hudson Light and Power Office Building located at 49 Forest Ave Hudson Mass. (See Attachment 2) 6. Supply and install one (1) CT cabinet 7. Provide line-item price to supply and install one (1) CT rated meter socket 8. Contractor shall remove existing electrical panel and supply and install one (1) 600 AMP 600 Volt 3 phase four (4) wire fused 3R disconnect switch with 600 AMP time delay fuses in the old electrical panels place. 9. Supply and install ground service to applicable code 10. Install and wire one (1) Hudson Light and Power supplied 300KW standby generator and associated equipment 11. Install and wire one (1) Hudson Light and Power supplied 600 AMP Automatic Transfer Switch (ATS)

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents