Similar Projects
Sludge Removal Louisville Water Treatment Plants
Term Contract
Bidding
Louisville, CO 80027

Sludge Hauling Services
Bidding
Louisville, CO

Dewatering Polymer
Post-Bid
Boulder, CO 80306

Disposal of Spoils City of Louisville Operations Division
Post-Bid
Louisville, CO 80027

On-Call Street Sweeping
Results
Longmont, CO

Disposal of Spoils 2020
Results
Louisville, CO 80027

Statewide Trash and Recycling Services
Term Contract
Post-Bid

Manchester IRSC
Results
Nederland, CO

Post Disaster Debris Collection Services
Post-Bid
Boulder, CO 80301

Blue DOT IRSC
Results
Less than $25,000 est. value
Nederland, CO

Boulder Airport Snow Removal Services
Post-Bid
Boulder, CO

On-Call Emergency Debris Removal
Term Contract
Results
Longmont, CO 80501

2020 - 21 Snow Removal and Ice Control Services
Term Contract
Post-Bid
Superior, CO

On-Call Residential Snow and Ice Control Services
Term Contract
Results
Broomfield, CO 80020

Spoils Hauling
Post-Bid
Boulder, CO 80301

Last Updated 08/31/2020 03:19 AM
Project Title

Snow Removal for BCHA Properties

Physical Address View project details and contacts
City, State (County) Gunbarrel, Lafayette, Longmont, Louisville, Lyons, CO   (Boulder County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide a list of the snow removal equipment and type of ice melt that will be used on site. Contractor shall remove snow and ice from sidewalks, steps, stairs, entrance ramps, ADA accessible parking spaces, and emergency exits. a. Contractor shall ensure the full width of the sidewalk is free of snow accumulation, piles, or drifts by removing all snow and ice from sidewalks, steps,entrance ramps, and ADA accessible parking spaces. b.Contractor shall remove snow, including drift or piles, from all remaining paved surfaces such as roads. Only the main drive areas shall be plowed (with the exception to ADA accessible parking spaces and access areas), as most of the parking spaces in the lots will be occupied. c. Contractor shall remove snow to ensure access to all trash and recycle receptacles. D. Snow may only be removed between 7 AM and 10 PM. E. Snow shall be pushed and stored at snow storage areas identified by BCHA at the beginning of the season. F. No snow shall be stored in any drainage areas, driveway, sidewalk, alley entrance, trash enclosure areas, or other areas that would result in blocking access to those areas. Snow will never cover or block access to any fire hydrant, emergency exit, or fire lane. G. Priority Areas Snow shall be removed within 24 hours at all sites after an event exceeding (1) inch: . Snow removal should be prioritized as follows: Priority 1 sites Priority 2 sites . See Attachment A for a listing of the Priority Areas. . Snow Plowing H.Contractor shall plow the parking lots to remove the majority of the snow/ice.Since most of the parking spaces in the parking lots will be occupied during this phase of snow removal, only the main drive areas shall be plowed (with the exception to ADA accessible parking spaces and access areas). I. ADA accessible parking areas are given priority and will be cleared first before clearing other parking or driveway areas. J. Ice Melt .Contractor shall spread sand and/or ice melt on the common sidewalks, steps, stairs, and ramps, as necessary, to restrict the formation of ice on solid surfaces. .Special attention shall be given to north sidewalk ways and common disabled access ways. .Contractor shall de-ice ADA accessible parking spaces. . De-icer should be spread out evenly and generously to ensure that all ice is melted. . Salting for ice/snow storms: Salt/ice melt must be IDOT and EPA approved, and must be environmentally friendly to minimize damage to concrete, landscape and wildlife. K. Heavy Snowfall . At the request of BCHA, when snowfall is heavy or accumulations become excessive, Contractor must be able to remove excess snow from the site. . Snow will be piled in areas so as not to unreasonably impede normal traffic flow, parking or create re-freeze concerns. Upon completion of snow plowing,Contractor will apply an ice melt product to sidewalk areas. Upon request, Contractor will remove and dispose of excess snow from the premises. L. Upon request by BCHA, Contractor shall immediately remove ice to provide securefooting or safe driving conditions by the snow removal operation, or by sanding with washed sand or application of slice product. Contractor will provide all materials.Contractor shall remove and dispose of excess accumulations of sand.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents