Similar Projects
Unit Upgrades, 48 Fairbank Circle 705-4
Bidding
$40,000 est. value
Sudbury, MA

On-Call Tub Refinishing Repairs
Bidding
$20,000 est. value
Lowell, MA

Weston Manor Shower Surrounds Installation
Post-Bid
Less than $75,000 est. value
Somerville, MA 02145

Shower Surround Installations at Various Developments
Post-Bid
Less than $99,000 est. value
Somerville, MA 02145

Crocker Hall Interior Renovations Phase 1 - General Bids
Results
Less than $660,000 est. value
Framingham, MA

Moisture Remediation Repairs
Results
$50,000 to $150,000 est. value
Framingham, MA 01701

Office Renovations Hale Middle School
Bidding
$80,000 est. value
Stow, MA 01775

Bryant Manor Shower Surrounds Installation
Post-Bid
Less than $95,000 est. value
Somerville, MA 02145

Bemis Water Treatment Plant - Filed Sub Bid
Results
Less than $7,400,000 est. value
Pepperell, MA 01463

Ceiling Tiles Removal and Replacement
Bidding
$515,000 est. value
Wilmington, MA 01887

Alterations for Buildings and Grounds at Farley - Filed Sub-Bids
Post-Bid
Framingham, MA 01702

Costello Basketball Suite Project - Filed Sub-Bids
Results
$3,000,000 est. value
Lowell, MA

Access Control Partitions
Post-Bid
Natick, MA 01760

Central Acton Water Treatment Plant Contract 1 - Filed Sub-Bids
Results
$6,800,000 est. value
Acton, MA 01720

Belmont Fire Department Headquarters Interior Repairs
Post-Bid
Less than $50,000 est. value
Belmont, MA 02478

Last Updated 02/01/2021 09:53 AM
Project Title

Renovation of Middle School Cafeteria Bathrooms

Physical Address View project details and contacts
City, State (County) Watertown, MA 02472   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Required A. Renovate the cafeteria restrooms: • Boys Restroom – 1 sink, 2 urinals, 1 stall/toilet • Girls Restroom – 2 sinks, 2 stalls/toilets • Gender Neutral Restrooms x2 - 1 sink each, 1 toilet each If funding allows, the Dept. of Public Buildings may elect to do one or more options below. Options should include all of the same specifications of the café bathrooms. • Options A: Renovate men’s staff bathroom by main office (2sinks, 1 urinal, 1 stall/toilet). • Options B: Renovate women’s staff bathroom by main office (2 sinks, 2 stalls/toilets).

Details

Division 02 - Existing Conditions.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents