Similar Projects
Riverlife Apartments
New Construction
Conception
Wausau, WI 54403

Riverlife Apartments
New Construction
Conception
Wausau, WI 54403

South 1st Avenue Apartments
New Construction
Design
$18,000,000 est. value
Wausau, WI 54401

The Foundry on 3rd
New Construction
Design
$44,000,000 est. value
Wausau, WI 54403

South Mountain Elementary School
Addition, Demolition, Infrastructure
Bidding
$3,000,000 CJ est. value
Wausau, WI 54401

V. Weston, Northwestern Avenue, Gold Ridge Way to County Road X
Infrastructure
Bidding
$500,000 CJ est. value
Wausau, WI 54403

County Road X Mill and Overlay
Infrastructure
Post-Bid
Wausau, Weston, WI 54403

Sealcoat
Infrastructure
Post-Bid
Wausau, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Street Improvements
Results
Less than $124,000 est. value
Edgar, WI

Landmark Apartments
Renovation - 123,918 SF
Construction
Wausau, WI 54403

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Rib Mountain Drive Restaurant
New Construction, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Wausau, WI 54401

New Riverlife Apartment Complex
New Construction, Infrastructure
Pending Verification
Wausau, WI 54401

Wausau - Merrill - Construct / Highway Safety Improvement Program (HSIP)
Infrastructure
Conception
$3,000,000 CJ est. value
Wausau, WI 54401

Last Updated 10/11/2022 12:07 PM
Project Title

Riverlife Condos

Physical Address View project details and contacts
City, State (County) Wausau, WI 54401   (Marathon County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $13,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of an apartment building. As of October 11, 2022, plans for this project have been approved. Information regarding the method of general contractor selection has not been disclosed. Construction is anticipated to begin April 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, New Construction, New Construction. Parking Spaces, 45 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents