Similar Projects
Reported | 07/14/2020 12:00 AM |
Project Title | Construction of the Lamb Loop Street and Drainage Improvements to Serve the CCBCI Distribution Center |
Physical Address | View project details and contacts |
City, State (County) | Tifton, GA 31793 (Tift County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $725,000 |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Lamb Loop Street & Drainage Improvements to serve the CCBCU Distribution Center as shown on the construction drawings. In general, construction consists of widening the existing two lane rural ditch section of roadway to a widened two lane curb and gutter roadway beginning and ending at intersections with U.S. Highway 41/S.R. 7 for a distance of approximately 0.50 miles. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |