Similar Projects
Roofing Rural Center - Municipal Reimbursement - Wake County
Alteration
Conception
$485,000 est. value
Raleigh, NC 27601

New Roof - Inspections/Planning Building - Person County
Alteration
Design
$315,361 est. value
Roxboro, NC 27573

RFP D/B - Moore & Locklear Hall Roof Replacement
Renovation
Sub-Bidding
$1,500,000 CJ est. value
Pembroke, NC 28372

Federal Correctional Institution 2 (FCI 2) Butner - Replace Roofs
Renovation
Sub-Bidding
$10,000,000 CJ est. value
Bahama, NC 27503

UMCG - Stone Building Roof Replacement
Alteration
Post-Bid
Greensboro, NC 27412

Hardy Building Roof Replacement
Alteration
Post-Bid
Kinston, NC 28504

B1022 Repair Roof, NBD, WCSU
Term Contract
Results
$25,000 to $100,000 est. value
Cherry Point, NC

Construction of Horace Sisk Roof Replacement Phase II
Alteration
Results
Fayetteville, NC 28303

Public Work Operation Center
Alteration
Construction
Durham, NC 27707

Hunters Creek Middle School Partial Reroof
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Jacksonville, NC 28546

Central Center Roof Removal and Replacement
Alteration
Post-Bid
Wadesboro, NC 28170

Replace Roof Coating for Costume, Wig and Makeup
Alteration
Results
Winston-Salem, NC 27127

West Brunswick High School Low Slope Roof Replacement
Renovation
Sub-Bidding
$600,000 CJ est. value
Shallotte, NC 28470

Public Works Roof Replacement - Section B
Alteration
Post-Bid
Shelby, NC 28150

Construction of the Department of Social Services and Judge E Maurice Braswell Courthouse Roof Membrane Re-Covers
Alteration
Results
$1,717,274 est. value
Fayetteville, NC 28301

Last Updated 07/12/2023 09:07 AM
Project Title

Re-Roofing Phase II

Physical Address View project details and contacts
City, State (County) Fairmont, NC 28340   (Robeson County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work will consist of renovations and modernization of existing project and includes, but is not limited to, the following items: 1. Remove and dispose of existing roof shingles, underlayment, inspect roof decking and replace rotten decking. Provide new underlayment, shingles and related items. 2. Remove existing wood trim at gable and provide new wood trim with pre-finished metal wrap. 3. Based on Lead Based Paint test performed in 1999; some of wood fascia and soffit contained Lead Based Paint above the action limit. Some of the buildings had the fascia board and soffit encapsulated and removed of as whole component removal and disposed of and new soffit/fascia installed. As part of this contract, wood trim at the gable louvers is being replaced. The prior test did not specifically test the trim now scheduled to be removed and it is unknown if it contains Lead Based Paint or not; furthermore, it is unknown if this trim was replaced or not in the 2000 abatement project. For the purposes of this contract, the Contractor shall assume that the trim contains Lead Based Paint and is to be removed and disposed of accordingly unless future test confirms that Lead Based Paint is not present. 4. Provide all other work as shown on Plans, in the Project Manual and as required by codes and the local authority having jurisdiction. 5. Photo Scope Review is included in Project Manual. Five Percent shall be based on the maximum bid price, ie: Base Bid plus Unit Prices plus Contingency Allowance plus All Add Alternates. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten (10) days after the award or to give satisfactory surety as required by law. (Bid Bond not required if bid is less than $100,000.00.) Refer to provisions for Equal Employment Opportunity and payment of not less than the minimum salaries and wages indicated in the project manual must be paid on this project. A Performance Bond and a Payment Bond will be required for one hundred percent (100%) of the contract price. Bond not required if Bid is less than $100,000.00. Payment will be made on the basis of ninety percent (90%) of monthly estimates and final payment made upon completion and acceptance of work. Questions that arise from the Site Visits are to be directed to the Architect at bids@stognerarchitecture.com. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents