Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

Mill and Overlay of SR 32
Infrastructure
Design
$10,000,000 CJ est. value
Water Valley, MS 38965

District 2 2022 Road Improvements
Infrastructure
Design
$6,287,666 CJ est. value
Starkville, MS 39759

Lauderdale County Detention Facility Drainage Repairs
Infrastructure
Bidding
$130,000 CJ est. value
Meridian, MS 39301

Gateway Industrial Park Lot B Site Development
Infrastructure
Bidding
$450,000 CJ est. value
Magnolia, MS 39652

Clock Tower (Rebid)
New Construction, Infrastructure
Post-Bid
$2,034,805 CJ est. value
Winona, MS 38967

Construct T-Hangar Phase 1
New Construction
Post-Bid
Newton, MS 39345

Weymouth Hall EWP Project - City of Natchez
Results
$150,098 est. value
Natchez, MS 39120

Loyd Star Attendance Center Drainage and Grading Improvements
Results
$125,160 est. value
Wesson, MS 39191

2021 Wastewater Improvements
Renovation, Infrastructure
Construction
$338,600 CJ est. value
Hickory, MS 39332

District 5 2022 Road Improvement
Infrastructure
Design
$1,788,767 CJ est. value
Starkville, MS 39759

Lift Station Rehabilitation
Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Byhalia, MS 38611

Gateway Industrial Park Lot G and Mississippi Army National Guard Lot Site Development
Post-Bid
$980,000 est. value
Magnolia, MS

Repairs to TASMG AON and TASMG Hangar Roof and Lights Replacement AON
Renovation
Results
Jackson, MS

Choctaw County Schools: Football Stadium
Infrastructure
Design
$70,000 CJ est. value
Ackerman, MS 39735

Last Updated 08/24/2022 01:31 AM
Project Title

Shed for Conduct of Fire Trailers (COFT)

Physical Address View project details and contacts
City, State (County) Hattiesburg, MS 39401   (Forrest County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Aircraft Hangar, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Shed for Conduct of Fire Trailers (COFT) Bidders shall be advised that in accordance with the Mississippi Code, the Military Department has Thirty (30) calendar days to deliver a warrant to the vendor from the date an application for payment is determined to be due and payable under the terms and conditions ofthe contract. The Adjutant General reserves the right to reject any and/or all bids and to waive informalities. Award of contract is subject to availability offunds. Bids will be held open for 90 days from bid date.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents