Similar Projects
North Smoky Hills Graveling
Renovation
Post-Bid

Culvert Linings
Renovation
Post-Bid

2021 Bituminous Paving
Results
$2,896,812 est. value
MN

2021 Street and Utility Improvements
Results
Hayfield, MN 55940

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Northwest Trail and 2021 Street Maintenance
Infrastructure
Results
$350,000 est. value
Kasson, MN

Bituminous Pavement Reclamation, Shoulder Widening, Aggregate Base, and Bituminous Surfacing
Infrastructure
Post-Bid
$400,000 est. value
Dodge Center, MN

Wasioja Township Roadway and Remove Bridges L2580
Demolition, Infrastructure
Results
MN

Bituminous Pavement Mill and Overlay on Dodge County Road 3
Infrastructure
Post-Bid
$400,000 est. value
Claremont, MN

Construct Roadway and Remove Bridge No. L2580
Demolition, Infrastructure
Results
$158,285 est. value
Dodge Center, MN

Bituminous Surfacing and Aggregate Shouldering, 2.8 miles West
Infrastructure
Post-Bid
$3,000,000 est. value
West Concord, MN

2021 Street Improvements
Infrastructure
Results
Mantorville, MN

2022 Street Reconstruction
Infrastructure
Post-Bid
$1,000,000 est. value
Mantorville, MN

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Concrete Pavement Rehabilitation
Infrastructure
Results

Reported 05/21/2022 12:00 AM
Project Title

2022 Street Improvements

Physical Address View project details and contacts
City, State (County) Claremont, MN   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Quotations, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $660,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Claremont is soliciting proposals for pavement surface improvements to the following streets: - East Street (from Alley South of 3rd St to a point approximately 490 feet north of 3rd St) - 2nd Street (from Wheat St to Main St) -Fire Hall Parking Lot The surface improvements include a 2" bituminous overlay, partial and full depth street patch, edge milling, and aggregate surfacing.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents