Similar Projects
West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Design
$10,000,000 est. value

West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Design
$10,000,000 est. value

Manson Ditch Drainage Improvements
Infrastructure
Bidding
Gretna, LA

HMGP Canal Crossing Project - Missouri Street at Corinne Canal Project
Infrastructure
Bidding
Chalmette, LA 70043

Luling Pe Office Flood Damage Repairs
Infrastructure
Post-Bid
$50,000 to $100,000 est. value
Luling, LA 70070

Cypress Island/Joe Daigre Drainage System Maintenance Project - Phase I
Infrastructure
Post-Bid
Saint Martinville, LA

Airline at Clearview Intersection Improvements
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
New Orleans, LA 70119

LA 114 - X Drain Replace West of Hessmer
Infrastructure
Results
$250,000 to $500,000 est. value
Hessmer, LA 71341

Clear Waterways
Infrastructure
Bidding
Baker, LA

Biloxi Marsh Living Shoreline Project
Infrastructure
Post-Bid
$50,500,000 est. value
LA

LA 378 - Up Rr Crossing (Westlake)
Infrastructure
Results
$250,000 to $500,000 est. value
Westlake, LA 70669

Drainage Project - South Magnolia to Cypress
Infrastructure
Bidding
Baker, LA

Walter O. Bigby Carriageway Drainage Pump Station
Infrastructure
Post-Bid
$3,900,000 est. value
Bossier City, LA

SB 1811 Farr Park Equestrian Center Phase 1 Arena
New Construction
Results
$740,000 to $800,000 est. value
Baton Rouge, LA 70820

Drainage Project - Parkwood Terrace to Morvant
Alteration
Bidding
Baker, LA

Reported 10/30/2021 12:00 AM
Project Title

Atchafalaya River Levees, St. Mary Levee District, Charenton Floodgate Replacement

Physical Address View project details and contacts
City, State (County) LA   (Saint Mary County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of clearing and grubbing; structural excavation; temporary retaining structure; placement of steel sheet-piling, H-piling and pipe piling; construction of 380 feet of new floodwall; construction of a new sector gate structure; placement of geotextile; excavation and levee embankment placement; miscellaneous metal work, painting, scour protection, turf establishment; and other related incidental work.

Details

Division 31 - Earthwork, Clearing and Grubbing, Erosion and Sedimentation Controls, Shoring, Sheet Piling, Steel Sheet Piling.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents