Similar Projects
Kearney Park - New Playground - City Of Watsonville
Infrastructure
Conception
$400,000 CJ est. value
Watsonville, CA 95076

Garfield Park Playground - c302217 - City of Santa Cruz
Infrastructure
Conception
$300,000 CJ est. value
Santa Cruz, CA 95060

Santa Cruz Jeep
Demolition, New Construction, Infrastructure - 5,602 SF
Design
$1,500,000 CJ est. value
Santa Cruz, CA 95060

Capitola Hotel
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Capitola, CA 95010

Natural Bridges Apartments
New Construction, Infrastructure - 15,000 SF
Bidding
$6,000,000 CJ est. value
Santa Cruz, CA 95060

Build and Install a New Awning Structure at the Existing Bus Fueling Station
Infrastructure
Bidding
$200,000 CJ est. value
Santa Cruz, CA 95060

Redwood Road Pm 0.23 0.31 0.33 Storm Damage Repair Project
Infrastructure
Post-Bid
$680,740 CJ est. value
Santa Cruz, CA 95060

Redwood Road Pm 0.23 0.31 0.33 Storm Damage Repair Project
Infrastructure
Post-Bid
$680,740 CJ est. value
Santa Cruz, CA 95060

3 Water Cogeneration Cooling Line Replacement
Infrastructure
Results
$250,000 est. value
Santa Cruz, CA 95060

Schulties Road PM 2.05 Storm Damage Repair Projects
Infrastructure
Results
$90,000 est. value
Los Gatos, CA 95033

180 Permanent Supportive Housing Project
Demolition, New Construction, Infrastructure - 49,961 SF
Pending Verification
$14,000,000 CJ est. value
Santa Cruz, CA 95060

La Madrona Mixed-Use Development
New Construction, Infrastructure - 6,600 SF
Pending Verification
$99,000,000 CJ est. value
Scotts Valley, CA 95060

Frederick Street Park Picnic Area - c302216 - City of Santa Cruz
Infrastructure
Conception
$285,000 CJ est. value
Santa Cruz, CA 95062

Conveyance Infrastructure
Infrastructure
Design
$51,000,000 CJ est. value
Santa Cruz, CA 95060

Wastewater System Repairs for Buena Vista Migrant Center
Infrastructure
Bidding
$200,000 CJ est. value
Watsonville, CA 95076

Last Updated 09/21/2022 04:58 PM
Project Title

CIP Pipeline Project

Physical Address View project details and contacts
City, State (County) Boulder Creek, CA 95006   (Santa Cruz County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $5,023,380 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project proposes to replace approximately 8,500 lineal-feet of water pipeline that is no longer effective due to age or is undersized. The proposed main will be 8-inch ductile iron pipe. The pipeline will be installed along both privately owned R.O.W and publicly maintained R.O.W (maintained by county of Santa Cruz) in addition to a small portion of pipeline requiring installation within Cal-trans R.O.W (State Highway 9) The project also involves replacement of an aging 40,000-gallon redwood tank with a new 160,000-gallon tank fitted with access hatches, and level monitoring instrumentation that will tiein to the districts existing SCADA system. The fixed liquidated damages amount is hereby established as one thousand dollars ($1,000) for each calendar day of unauthorized delay in completion of the Work.BONDS. The Bidder to whom the award is made will be required to submit a payment bond and a performance bond, each in a principal amount not less than one hundred percent (100%) of the total Contract Price.Bid security or a bid guaranty bond, in an amount not less than ten percent (10%) of the Total Bid amount, is required to be submitted with the Bid. Requests for interpretation of the Contract Documents shall be submitted to Josh Wolff, District Engineer at SLVWD in writing to JWolff@slvwd.com no later than 3:00 pm on July 18, 2022. SLVWD will release a final response to requests for interpretation no later than 3:00 pm on July 20, 2022. All requests and responses thereto will be posted to the District website not later than 5:00 p.m. on July 20, 2022. SLVWD reserves the right to reject any and all bids

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents