Similar Projects
Four-Stall Bathroom Concrete Structure (Building)
Term Contract
Sub-Bidding
$1,000,000 CJ est. value
Canton, MA 02021

2022-2023 Snow Plowing Operations - Tentative Schedule of Proceedings
Term Contract
Sub-Bidding
Stoughton, MA 02072

On Call Integrated Pest Management Services - Group 4
Post-Bid
Boston, MA

On Call Integrated Pest Management Services - Group 3
Post-Bid
Boston, MA

World-Wide Water Storage Tank Remediation
Term Contract
Results

1.15 MG Hill Street Water Storage Tank
Results
$2,350,000 est. value
Foxborough, MA 02035

Tree Planting Fall 2022
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Quincy, MA 02169

On Call Integrated Pest Management Services - Group 2
Post-Bid
Boston, MA

Oil Tank Removal
Renovation
Results
$26,500 CJ est. value
Westwood, MA 02090

PWE Padmounted 3 - Phase Recloser
Term Contract
Sub-Bidding
Braintree, MA 02184

On Call Integrated Pest Management Services - Group 5
Post-Bid
Boston, MA

On Call Integrated Pest Management Services - Group 1
Post-Bid
Boston, MA

Water Tanks Maintenance and Asset Management
Term Contract
Post-Bid
Canton, MA

Extermination of Vermin
Alteration
Post-Bid
Boston, MA

Portable Toilet Rental and Service
Term Contract
Post-Bid
Salem, MA 01970

Last Updated 08/12/2022 05:03 AM
Project Title

Water Tank Cleaning, Inspection and Chlorination Services

Physical Address View project details and contacts
City, State (County) Stoughton, MA 02072   (Norfolk County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Service/Term Contracts, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 08/23/22
Owner View project details and contacts
Architect View project details and contacts
Description

From responsible and eligible providers for On Call Water Tank Cleaning, Inspection and Chlorination Services. The service will include 4 of the Town's Water Storage Tanks. The main focus of this project is to perform a comprehensive evaluation of the interior and exterior condition of the tanks, tank cleaning/sediment removal and chlorination. The Town of Stoughton reserves the right to accept or reject any and all bids when it is in the Towns best interest to do so. The Town intends to award one contract for one year with two oneyear options to renew based on the sole recommendations of the Town.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents