Similar Projects
2020 Paving Project
Post-Bid
Carmichaels, PA 15320

Paving project at the Mapletown Junior/Senior High School
Post-Bid
Greensboro, PA 15338

2020 Roadway Improvement Project
Post-Bid
Carmichaels, PA 15320

2021 Road Improvement Project
Post-Bid

Superpave, Wearing Course
Post-Bid
Waynesburg, PA 15370

Asphalt Seal Coat
Bidding
Waynesburg, PA

Superpave Asphalt
Post-Bid
Sycamore, PA 15364

Goodwin Hill Road Improvement Project
Post-Bid
Spraggs, PA 15362

Roberts Run Road Improvements Project Phase 2
Results
Garards Fort, PA 15334

40 Ton Superpave Binder Course
Post-Bid
Waynesburg, PA 15370

Superpave Asphalt
Post-Bid
Sycamore, PA

Seal Coat
Post-Bid
Waynesburg, PA 15370

Bituminuous Seal Coat, Stone
Post-Bid
Waynesburg, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

SIP 12-20-SI2-1
Results
$2,500,000 to $4,999,999 est. value
PA

Reported 05/04/2021 12:00 AM
Project Title

Nesbit T-666 (Aka Nesmith) Road Repairs

Physical Address View project details and contacts
City, State (County) Carmichaels, PA   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work in this contract shall consist of the Township providing and delivering all materials needed for the project with the awarded contractor providing all equipment and labor for installing and doing any required work associated with the project. Work consists of raising the road profile between 0 and 33 installing drainage utilizing the owner supplied and delivered materials. Work consists of six (6) 15 drain pipes (301LF), one (1) 18 drain pipe (51LF) and replacement of one 18 drain pipe with 48 arch pipe (33LF) filled to wide spot with R-4. Multiple pipe outlets are beyond the roadway limits to allow for adequate pipe grade to discharge point. Each pipe will require construction of stacked stone headwalls and endwalls with owner supplied material. Road profile will be graded, raised in lifts and compacted, from 0 up to 33 over the 900 foot entrenched section. The materials to be used for fill on roadway will be 3A Modified Aggregate (1600 Ton) and Crush and Run 2A (770 Ton). R-5 installation for grade controls (10 Ton).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents