Similar Projects
Fuel Tank Inspection for USCG Base Elizabeth City, NC
Bidding
Elizabeth City, NC 27909

Diesel Fuel Ast Replacement
Bidding
Fayetteville, NC

Underground Storage Tank Removal
Post-Bid
Cary, NC

Replace Natural Gas Piping (House Piping)
Post-Bid
Weldon, NC 27890

Main Campus Steam Plant - Fuel Oil Containment Facilities Replacement
Results
Less than $2,227,900 est. value
Greenville, NC 27858

Residential Gas Meters
Results
Rocky Mount, NC

Demolition Services for Harnett County Public Building/Facilities Management
Demolition
Post-Bid
Olivia, NC 27332

Hypochlorite Tank #1 Replacement
Results
Less than $520,000 est. value
Kannapolis, NC

Former Police HQ Building - Underground Storage Tank Closure
Post-Bid
Raleigh, NC 27601

Fuel Farm Expansion Phase III
Results
Charlotte, NC

Petroleum Tank Installation, Operations and Maintenance Services
Term Contract
Post-Bid
Charlotte, NC 28206

Gas Leak Detection and Atmospheric Corrosion Survey Services
Term Contract
Results
Greenville, NC 27834

Fuel Storage Tanks
Term Contract
Post-Bid
Raleigh, NC 27699

Boat Refueling System Repairs for the U.S. Coast Guard (USCG) Station Hatteras Inlet
Results
Hatteras, NC 27943

Liquefied Petroleum Gas & Tank Monitoring Services
Post-Bid
Jacksonville, NC 28542

Last Updated 01/21/2021 10:53 AM
Project Title

ODOR Control System for Sludge Holding Tanks, Ocean Sands Wastewater Treatment Plant 200,000 GPD, Phase I

Physical Address View project details and contacts
City, State (County) Corolla, NC 27929   (Currituck County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $60,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase and install 200 scfm blower. Provide concrete pad and bollard protection. Provide electrical connection, complete and operational, into existing wastewater treatment plant breaker panel. 1. Provide and install piping and diffuser system including but not limited to: a. Elastomeric heat resistant connection to blower. b. 3” galvanized header piping system in two existing sludge holding tanks. c. 1 ½” galvanized drop piping system within two existing sludge holding tanks including ball valves, unions and header assembly. d. Snap Cap, or approved equal, coarse air diffusers.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents