Similar Projects
Raw Water Main K-6 Well 5 to Larry Street Road WTF 4
Infrastructure
Bidding
Daphne, AL

2020 PS03 Pump Station Upgrades
Renovation, Infrastructure
Bidding
$3,500,000 est. value
Birmingham, Brighton, AL 35203

J066--De-Ionizing Water Systems Maintenance
Post-Bid
Tuskegee, AL 36083

Installation of Water Mains and Appurtenances Connected thereto and 138 Water Services
Post-Bid
Homewood, AL

24" Raw Water Line
Results
Less than $1,709,019 est. value
Bessemer, AL 35006

Water Main Installation
Results
Less than $1,506,146 est. value
Elba, AL 36323

Brookwood Parkway Water Main
Infrastructure
Construction
Vance, AL 35490

Crisstown Road Water Main Replacement
Infrastructure
Construction
$200,000 est. value
Tuscaloosa, AL

Lauder Lane to Collegiate Lane Water Main Improvements
Infrastructure
Bidding
Orange Beach, AL 36561

Agriculture Waterline Extension
Post-Bid
Hamilton, AL

New Water Transmission Main Supply to Redmill - Phase 2 Contract No. 6
Results
Less than $1,200,000 est. value
Jasper, AL 35503

Quad Residence Halls and Quad Drive - Infrastructure and Accessibility Improvements
Infrastructure
Bidding
Auburn, AL

Automated Meter Reading (AMR) System
Post-Bid
Fort Payne, AL

Marion County 2019 CDBG Bexar Church/Shottsville Water Line Extensions
Results
Less than $578,000 est. value
AL

3/4" and 1" Backflow Preventers
Term Contract
Bidding
Dothan, AL

Last Updated 02/15/2022 10:24 AM
Project Title

Wannville Phase III Water Main Extensions

Physical Address View project details and contacts
City, State (County) Hollywood, AL 35752   (Jackson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $460,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of installation and approximately 17,000 LF of 6” water main, 4,000 LF of 3” water main (Bid Schedule “A”) or 21,000 LF of 6” Water Main (Bid Schedule “B”), 120 LF of 12” Bore and Case, Valves, Fire Hydrants, Services, Meters and related appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents