Similar Projects
Last Updated | 07/30/2021 03:49 AM |
Project Title | Overlay - FY 2021-2022 |
Physical Address | View project details and contacts |
City, State (County) | Prescott, AZ (Yavapai County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $486,300 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work for this project includes furnishing of all labor, materials, equipment, fixtures, and services required for a 0.5" to 1.5" (0.5" at centerline, 1.5" at pavement edge) tapper mill and a 1.5" fiber reinforced asphaltic concrete overlay on Pinon Woods Drive, Ponderosa Road, and Cypress Place in Village of Oak Creek; and a 2" fiber reinforced asphaltic concrete overlay on Top O The Morning Drive in Rimrock, and Vista Drive in Camp Verde. The total project length is 7,890 feet with approximately 1,333 tons of fiber reinforced asphaltic concrete with PG 70-10 binder and 1,016 tons of fiber reinforced asphaltic concrete with PG 70-22 TR+ binder. Other associated work includes water valve box frames and manhole frames adjustment, 11,875 square yards of bituminous pavement milling and hauling, thickened edge preparation on Vista Drive and re-established pavement markings on Top O The Morning Drive. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |