Similar Projects
2022 Bond - Proposition A - Gregory-Portland ISD
Demolition, New Construction, Renovation, Infrastructure
Conception
$145,609,020 CJ est. value
Portland, TX 78374

IHOP / Mathis
New Construction, Infrastructure - 4,560 SF
Design
$400,000 CJ est. value
Mathis, TX 78368

Community RV Resort - Gregory
New Construction, Infrastructure - 8,711 SF
Design
$9,350,000 CJ est. value
Portland, TX 78374

324 Huff St. Harbor Safety and Enforcement Office Docks
New Construction, Infrastructure
Bidding
$222,573 CJ est. value
Aransas Pass, TX 78336

Green Lake Drainage Improvements
New Construction, Infrastructure
Bidding
$5,450,000 CJ est. value
Portland, TX 78374

Stephen F. Austin Elementary Playground Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Gregory, TX 78359

St. Patricks Mission Old Parish Hall Demolition
Demolition, Infrastructure
Post-Bid
$100,000 CJ est. value
Mathis, TX 78368

2022 Street Maintenance Project
Infrastructure
Results
$489,063 CJ est. value
Sinton, TX 78387

4th Street Improvements
Infrastructure
Results
$4,275,797 CJ est. value
Ingleside, TX 78362

Interior Painting and Doorway Installation at City Hall
Renovation
Construction
$135,792 CJ est. value
Portland, TX 78374

Freddy's Frozen Custard & Steakburgers / Portland
New Construction, Infrastructure - 2,996 SF
Construction
$1,550,000 CJ est. value
Portland, TX 78374

Welder Solar
Infrastructure
Pending Verification
$30,000,000 CJ est. value
Sinton, TX 78387

Highway 181 Retail / Portland
New Construction, Infrastructure - 15,076 SF
Pending Verification
$2,800,000 CJ est. value
Portland, TX 78374

Haven Storage / The Haven Self Storage
New Construction, Infrastructure - 55,450 SF
Design
$4,400,000 CJ est. value
Gregory, TX 78359

RFP Construction Manager at Risk - San Patricio County Courts Annex Building and Courthouse Renovation
Renovation - 92,000 SF
Bidding
$70,000,000 CJ est. value
Sinton, TX 78387

Last Updated 10/27/2022 05:05 PM
Project Title

RFP Construction Manager at Risk - Courts Annex Building & Courthouse Renovation

Physical Address View project details and contacts
City, State (County) Sinton, TX 78387   (San Patricio County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Competitive Bids
Project Status Request for Proposals (RFPs), Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $70,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Phase I - Courts Annex Building: $51,000,000.00 Phase II - Courthouse Renovation: $19,000,000.00 The project is divided into two phases of construction. In Phase I, a new Courts Annex Building will be constructed to move the Judicial Courts and other associated departments for the County out of the existing Courthouse. Phase II will consist of a complete renovation of the existing Courthouse to reconfigure it's use for the County's Administrative Departments that will remain at the building. Phase I - The San Patricio County Courts Annex Building will be located within new development on the east side of Sinton, south of E. Sinton St. and west of Highway 181. The proposed building will be an approximately 92,000 square feet, three story building containing the three District Courts for the County and the County Court at Law. Facilities for the District Attorney, County Attorney, District Clerk, and County Clerk departments are also to be housed in the building. Phase II - The existing San Patricio County Courthouse Building is located at 400 W. Sinton St., Sinton, TX. The original building was constructed in 1926 with major additions added in 1953 and 1995 with a current total building area of approximately 49,000 square feet. The renovation will include demolition of most of the building back to the existing structure in order to reconfigure it for the County Administration departments that will be housed in the building. An approximately 9,400 square foot addition is proposed to the front entry of the building to facilitate accessible entry including lobby, elevator, stair and public restroom core for each floor. Deadline for Questions and Inquiries: October 31, 2022, at 4:00 p.m. Questions regarding this project should be EMAILED to: Justin Dreyer BRW Architects jdreyer@brwarch.com

Details

3 Stories Above Grade, 92,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents