Similar Projects
I-75 Reconstruction
Infrastructure
Bidding
MI

Corrugated Metal Pipe
Alteration
Bidding
Saint Clair, MI

Iron Belle Trail Bridge
Post-Bid
Petoskey, MI 49770

Quanicassee Road Grade, Base, Drainage
Post-Bid
Caro, MI 48723

Fish Dam Creek Crossing - Bridge/ Culvert
Results
MI

Public Safety Campus Expansion, Phase II
Results
Walled Lake, MI

Improvements to Breton-Burton Drain (Mission Hills, Capilano, and Southwest Branches
Alteration
Bidding
$575,305 est. value
Grand Rapids, MI

Construction for the Steel and Wallbridge Drain Astwood Mews Branch
Post-Bid
Saint Johns, MI 48879

Ditching/Excavation Baraga Co and Southern Houghton Co
Results

Concrete Patching and Drainage Structure Repairs
Infrastructure, Alteration
Bidding
Detroit, MI

Site Drainage Improvements
Post-Bid
Port Huron, MI 48060

Ball Creek No. 4 Drain Culvert Replacement
Results
Less than $282,816 est. value
Grand Rapids, MI

Corrugated Metal and Plastic Pipe
Infrastructure
Bidding
Lapeer, MI

Church Road Over Muskrat Creek
Post-Bid
Saint Johns, MI 48879

Little Tobacco River Intercounty Drain
Results
Mount Pleasant, MI

Last Updated 01/04/2022 08:38 AM
Project Title

Ottawa Beach Retaining Wall Segments

Physical Address View project details and contacts
City, State (County) West Olive, MI   (Ottawa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To replace existing wood timber and concrete retaining walls as well install new segments of modular concrete retaining wall along a pedestrian walkway at its Historic Ottawa Beach Parks near Holland State Park in Park Township. The work includes removal of existing retaining wall structures, minor grading, site preparation, and installation of a new modular concrete block retaining wall system complete including base material, wall block, required tie-backs and cap

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents