Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Subgrade Stabilization
Infrastructure
Results

500cc UTV With Snow Plow and Enclosure
Infrastructure
Post-Bid

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

Roof and Grounding System
Term Contract, Renovation, Infrastructure
Post-Bid
$335,000 CJ est. value
Hopewell, VA 23860

2022 Latex Modified
Infrastructure
Results
$2,130,000 est. value

Well Installation and Well Abandonment
Infrastructure
Post-Bid
$320,000 CJ est. value
Highland Springs, VA 23075

2022 Surface Treatment
Infrastructure
Results
$875,000 est. value

2022 Slurry Seal
Infrastructure
Results
$2,715,000 est. value

2022 Latex Modified
Infrastructure
Results
$2,467,000 est. value

2022 Surface Treatment
Infrastructure
Results
$4,361,000 est. value

Last Updated 08/29/2022 04:32 PM
Project Title

Moultrie Avenue Roadway and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Hopewell, VA 23860   (Hopewell City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,380,014 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Moultrie Avenue and Drainage Improvements was awarded to Perkinson Construction LLC. for $2,380,014.14. At this time, the anticipated start date is unknown. The City of Hopewell is seeking qualified contractors to complete Moultrie Avenue Roadway and Drainage improvements.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents