Similar Projects
Last Updated | 05/03/2022 12:52 PM |
Project Title | Repair of the Bridge on S.R. 154 over U.S. 127 (S.R. 28) (L.M. 2.20) |
Physical Address | View project details and contacts |
City, State (County) | TN (Fentress County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 105-01 Construction Stakes, Lines And Grades (1) Ls 201-07.01 Removal And Disposal Of Brush & Trees (1) Ls 202-04.01 Removal Of Structures (Description, Sta.) (Bridge No. 25-Sr154-02.20) (1) Ls 204-02.01 Dry Excavation (Bridges) 862.000 c.y. 209-08.03 Temporary Silt Fence (Without Backing) 210.000 l.f. 303-10.01 Mineral Aggregate (Size 57) 904.000 Ton 307-01.01 Asphalt Concrete Mix (Pg64-22) (Bpmb-Hm) Grading a 68.000 Ton 307-01.08 Asphalt Concrete Mix (Pg64-22) (Bpmb-Hm) Grading b-m2 141.000 Ton 403-01 Bituminous Material For Tack Coat (Tc) 1.950 Ton 411-01.10 Acs Mix(Pg64-22) Grading d 206.000 Ton 411-12.04 Scoring For Rumble Stripe (Noncontinuous) (4in Width) 0.400 l.m. 415-01.01 Cold Planing Bituminous Pavement 210.000 Ton 604-03.04 Pavement @ Bridge Ends 214.000 s.y. 604-04.02 Applied Texture Finish (Existing Structures) 3,194.000 s.y. 604-10.05 Concrete 81.000 s.f. 604-10.14 Remove Existing Wearing Surface (1) Ls 604-10.50 Bridge Deck Repairs (Partial Depth Of Slab) 10.000 s.y. 604-10.54 Concrete Repairs 81.000 s.f. 604-10.58 Epoxy Injection (Injection) 4.000 Gal. 604-10.62 Epoxy Injection Repair (Complete And In Place) 63.000 l.f. 604-10.83 Composite Fiber Encasement 4,156.000 s.f. 617-04.01 Type 1 Thin Epoxy Overlay (Epoxy-Urethane) 1,590.000 s.y. 621-05.02 Temporary Shoring (1) Ls 705-02.10 Guardrail Transition 27in To 31in 1.000 Each 705-06.01 w Beam Gr (Type 2) Mash Tl-3 190.000 l.f. 705-06.11 Gr Terminal (In-Inline) Mash Tl-3 1.000 Each 706-01 Guardrail Removed 120.000 l.f. 709-05.06 Machined Rip-Rap (Class a-1) 338.000 Ton 710-09.02 6" Pipe Underdrain 60.000 l.f. 710-10.02 6" Perforated Plastic Pipe 180.000 l.f. 712-01 Traffic Control (1) Ls 712-01.05 Flagman 120.000 Hour 712-02.02 Interconnected Portable Barrier Rail 680.000 l.f. 712-02.47 Bridge Mounted Interconnected Portable Barrier Rail 480.000 l.f. 712-02.60 Temporary Work Zone Crash Cushion (Mash Tl-3) 2.000 Each 712-04.01 Flexible Drums (Channelizing) 85.000 Each 712-04.50 Barrier Rail Delineator 26.000 Each 712-06 Signs (Construction) 699.000 s.f. 712-08.20 Truck Mounted Attenuator w/Mssage Board 12.000 Day 712-09.02 Removable Pavement Marking (8" Barrier Line) 1,740.000 l.f. 712-09.04 Removable Pavement Marking (Stop Line) 24.000 l.f. 712-09.08 Removable Pavement Marking (6" Line) 400.000 l.f. 713-16.01 Changeable Message Sign Unit 4.000 Each 716-01.21 Snowplowable Raised Pavement Markers (Bi-Dir) (1 Color) 8.000 Each 716-01.30 Removal Of Snowplowable Reflective Marker 8.000 Each 716-12.02 Enhanced Flatline Thermo Pvmt Mrkng (6in Line) 0.600 l.m. 717-01 Mobilization (1) Ls 730-40.02 Temporary Traffic Signal System (1) Ls 740-07.04 Geogrid Reinforcement Type 2 1,447.000 s.y. 740-10.04 Geotextile (Type Iv)(Stabilization) 800.000 s.y. 740-11.03 Temporary Sediment Tube 18in 100.000 l.f. |
||||||||||||||||||||
Details | Bridge, Renovation.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |