Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Summit Avenue Mixed Use
New Construction, Infrastructure - 3,183 SF
Design
$230,000,000 CJ est. value
Jersey City, NJ 07306

Summit Avenue Mixed Use
New Construction, Infrastructure - 3,183 SF
Design
$230,000,000 CJ est. value
Jersey City, NJ 07306

RFQ D/B - Design-Build Services for Construction of a New Bayonne Vocational High School
New Construction, Infrastructure - 36,000 SF
Bidding
$22,000,000 CJ est. value
Bayonne, NJ 07002

Hackensack Avenue Streetscape
Infrastructure
Bidding
$600,000 CJ est. value
Kearny, NJ 07032

Water System Contract Operation and Management Services
Post-Bid
Kearny, NJ

Bituminous Concrete Resurfacing - As Needed
Post-Bid
Jersey City, NJ

Repaving of Parking Lots at Various Sites
Results
Bayonne, NJ 07002

FY2020 CDA Roads - 42nd Street and 47th Street
Results
Union City, NJ 07087

Romaine Avenue Apartment Building
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Jersey City, NJ 07306

Romaine Avenue Apartment Building
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Jersey City, NJ 07306

Interior Alterations for Culinary Arts Room and Kitchen
New Construction, Infrastructure
Design
$4,780,000 CJ est. value
Weehawken, NJ 07086

Replacement of the North Avenue Bridge over I-95, New England Thruway
Infrastructure
Bidding
$2,000,000 CJ est. value
New Rochelle, NY 10801

2019 NJDOT Roadway Preservation Various Street
Post-Bid
Hoboken, NJ

Johnston Avenue Road Improvements
Results
Jersey City, NJ 07307

Last Updated 08/09/2022 10:05 AM
Project Title

Catch Basin Replacement

Physical Address View project details and contacts
City, State (County) Kearny, NJ 07032   (Hudson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $31,600 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the furnishing of all labor, materials and equipment necessary to complete the work as shown on the Drawings and as described in the Specifications. The work consists of replacing existing catch basins including associated curb and pavement restoration and traffic control. The work is located along 3rd Street and at the Kearny Point Pump Station within the Town of Kearny and includes: site work and general construction. The work shall be completed within 60 calendar days of the Contractor's receipt of written Notice to Proceed.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents