Similar Projects
D128 Summer HVAC Upgrades at Libertyville HS
Bidding
Libertyville, IL 60048

N041--25 Ton Chiller Replacement
Post-Bid
North Chicago, IL

HVAC Preventative Maintenance for Lake County Public Works Facilities and the City of Waukegan
Term Contract
Post-Bid
Libertyville, Waukegan, IL 60048

Range Ventilation System Replacement
Renovation
Results
Vernon Hills, IL 60061

Trainer and Dark Room 2020 HVAC Upgrades at Libertyville HS
Results
Libertyville, IL 60048

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

Building 310 Exhaust Fan
Results
Gurnee, IL

2020 HVAC Preventative Maintenance Services
Term Contract
Post-Bid
Fox Lake, IL

2021 HVAC Upgrades Diamond Lake School
Results
Mundelein, IL

HVAC and Mechanical Products
Term Contract
Post-Bid

Leisure Center HVAC Roof-Top Unit
Results
Zion, IL 60099

2021 HVAC Upgrades at Antioch Community HS
Post-Bid
Lake Villa, IL

2021 Rooftop Unit Replacement
Post-Bid
Antioch, IL 60002

Rooftop Solar Panel Installation and Operations
Post-Bid
Highland Park, IL 60035

2021 HVAC Improvements at Rondout ES
Post-Bid
Lake Forest, IL 60045

Last Updated 08/27/2020 07:43 AM
Project Title

2020 Community Center HVAC Replacement

Physical Address View project details and contacts
City, State (County) Lake Zurich, IL 60047   (Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Terminate gas, electric and sheet metal to units. Remove two (2) condensing units. Remove two (2) air handling systems and furnaces. Furnish and install two (2) new Carrier air handling units. Furnish and install two (2) new Sterling in-line duct heaters. Furnish and install two (2) new Carrier condensing units. Only one (1) system will be removed at a time due to the facility being occupied. Likewise, installation of only one (1) system at a time to maintain adequate cooling/heating as necessary for any office space being occupied. Install new refrigeration piping including liquird line dryers between new air handling units and condensing unit coils. Install new outside controls for fresh air intake per code. Install new b-vent and single wall vent from air handling units heat exchanger. Install new condensate drain from air handling units. Complete all necessary electric and gas modifications, connections, and materials to new air handling units. Install all necessary materials to complete installation of aforementioned new air handling units, condensing units with fresh air intakes, and in-line duct heaters per code. Fabricate all necessary sheetmetal plenums and transitions for new dimensions. All new duct work will be secured and sealed. Ensure safe transportation of both old and new equipment in and out of the building to prevent damage to any surfaces and/or structures, including Community Center grounds and parking lots. All control wiring will be installed for a complete and functional system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents