Similar Projects
Flood Damage Shoreline Stabilization Projects
Infrastructure
Bidding
Clayton, NY 13624

Technology Namm Hall Loading Dock Improvements with Associated Asbestos Abatement
Infrastructure
Bidding
Brooklyn, NY 11201

Removal of a Pier/ Platform
Post-Bid
Kauneonga Lake, NY 12749

Lehigh Cement Dock Repairs - CO 109 03RED03
Post-Bid
Oswego, NY 13126

Miscellaneous Structure and Outfitting Improvements
Renovation
Results
$100,000 to $250,000 est. value
Dresden, NY

Boat Launch Reconstruction
Results
Willsboro, NY 12996

Battery Coastal Resilience Project
Renovation
Pending Verification
New York, NY 10012

Kayak Launch at Ontario Beach Park
Post-Bid
Canandaigua, NY 14424

Rehabilitate Fish Ladder and Viewing Platform - Salmon River Fish Hatchery
Results
$3,000,000 to $4,000,000 est. value
Altmar, NY 13302

Niagara River and Ellicott Creek Riverfront Access and Docks Improvement
Term Contract
Post-Bid
Tonawanda, NY 14150

Replace Deteriorating Dock System at Cedar Point State Park
Results
Less than $540,222 est. value
Clayton, NY 13624

Fabrication of Warning Buoys
Post-Bid
Massena, NY 13662

Replace Deteriorating Dock System at Mary Island State Park
Results
Less than $252,194 est. value
Alexandria Bay, NY

Champlin Beach Infrastructure Improvements
Post-Bid
Hammondsport, NY 14840

Wilson Boat Docks Improvement Phase 2
Results
Wilson, NY 14172

Reported 01/01/2022 12:00 AM
Project Title

OD Heck Loading Dock Upgrade

Physical Address View project details and contacts
City, State (County) Schenectady, NY 12304   (Schenectady County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $50,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Loading dock leveler repair and replacement. This project is regarding the replacement and repair of the loading dock and dock leveler. SCOPE OF WORK includes, but is not necessarily limited to the following: Replace a section of steel diamond plate deck (left side as facing the building) approximately 24”W x 14.5’L with new steel, along with painting new section. Install a 4’ yellow safety railing on top side of concrete dock from right side of steel deck to cinderblock wall (behind rolling dumpster). Remove current dock leveler and replace with 6’ by 8’ lift table. A 10’W x 10’L x 4”H pad needs to be poured prior to installing the lift table. Two 48” bollards must be stationed and anchored in front of the lift table to help prevent accidental collision. Please include preplanned preventative maintenance visits to ensure everything is in working order for 6 months and 12 months.

Details

Division 11 - Equipment, Loading Dock Equipment, Stationary Loading Dock Equipment, Loading Dock Levelers.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents