Similar Projects
Hermitage Subdivision Development Phase V
New Construction
Design
Berryville, VA

Pedestrian Hybrid Beacon
Alteration
Bidding
Richmond, VA

Bayville Farms Park Restroom Renovation
Renovation
Bidding
Virginia Beach, VA

Transloading Facility/Rail Yard Land Disturbance
Renovation
Post-Bid
Dillwyn, VA 23936

Wetland Restoration and Stormwater Improvements
Renovation
Post-Bid
Portsmouth, VA 23704

Former Container Site Closures
Results
Less than $46,937 est. value
VA

Clearing/Grading Construction Project Wood Haven Technology Park
Results
Roanoke, VA 24011

Commonwealth Center Phase 2 Gas Station Site
New Construction
Construction
Ashburn, VA

Newport News Transit Center Site Reconstruction
Construction
$47,000,000 est. value
Newport News, VA

Cap for Virginia Beach Landfill No. 2
Infrastructure
Bidding
Virginia Beach, VA 23464

Site-Work On-Demand Construction Program
Post-Bid
Charlottesville, VA

Grading at Explore Park
Results
VA

Compass Creek Site Work
New Construction
Construction
Leesburg, VA

Pinewood Forest Project
Infrastructure
Bidding
Wise, VA 24293

Lockwood Broadcasting Offices + Production Studio
New Construction
Post-Bid
Charlottesville, VA 22901

Last Updated 11/16/2021 03:49 PM
Project Title

Barnette Energy, LLC Bond Forfeiture DMM Permit #90494AA

Physical Address View project details and contacts
City, State (County) Big Stone Gap, VA   (Wise County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 to $475,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In summary, the scope of work shall consist of mobilization of the contractor’s workforce and equipment, construction site preparation, construction site layout surveying, installation of erosion and sediment controls, upgrade and/or construction of access roads, excavation, removal of coal stockpiles, installation of temporary drainage controls, structure demolition and removal, removal of sediment ponds, closure and sealing of existing piezometers and ground water monitoring points, revegetation, and clean up and repair of damage to the project site.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents