Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Seerley Park Renovation - 150 - City of Cedar Falls
Infrastructure
Design
$300,000 CJ est. value
Cedar Falls, IA 50613

Main Street Reconstruction - City of Cedar Falls
Infrastructure
Design
$12,025,000 est. value
Cedar Falls, IA 50613

HMA Resurfacing With Milling
Infrastructure
Bidding
$3,500,000 CJ est. value
Corning, IA 50841

HMA Resurfacing With Milling
Infrastructure
Bidding
$3,500,000 CJ est. value
Corning, IA 50841

HMA Resurfacing - I-80
Infrastructure
Post-Bid
IA

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

FY2021 Sidewalk and Trail Repair Program Zone 1
Infrastructure
Results
Waterloo, IA 50703

Facilities Management North Parking Lot - Phase 2
Infrastructure
Results
Cedar Falls, IA

Gibson Property Development - Phase lll-V - City of Cedar Falls
New Construction, Infrastructure
Pending Verification
$1,400,000 CJ est. value
Cedar Falls, IA 50613

Union at North Crossing
New Construction, Infrastructure
Pending Verification
$68,000,000 CJ est. value
Waterloo, IA 50703

Industrial Park Expansion (Phase I) - 5 - City of Cedar Falls
Alteration
Conception
$6,000,000 est. value
Cedar Falls, IA 50613

FY 2022 Asphalt Overlay Program
Infrastructure
Post-Bid
Waterloo, IA

27th Street Corridor Site Work
Infrastructure
Results
$753,800 est. value
Cedar Falls, IA 50614

Last Updated 12/13/2022 11:35 AM
Project Title

Ida Grove City Hall Project

Physical Address View project details and contacts
City, State (County) Ida Grove, IA 51445   (Ida County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,744,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

New construction of a single story 4,700 SF wood-framed building with a partial basement. The City Hall project will consist of site work, parking, and necessary building components to accommodate the City's staff offices, Conference Room, Storage, and Council Chambers. Specific questions should be addressed to Kelsey Vetter, AIA. (kvetter@f-w.com) As of September 9, 2022, no new information available Work shall cover the full extent of contract documents including site work, parking & vehicular features, and new construction of a 4,700 SF wood framed building.

Details

1 Story Above Grade, 4,700 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents