Similar Projects
HVAC Upgrades to West Virginia State Office Building Nos. 5, 6, & 7
Renovation
Design
$50,000 CJ est. value
Charleston, WV 25301

Met Theater HVAC Improvements
Alteration
Bidding
$800,000 est. value
Morgantown, WV 26505

CFP 2022 - Sunset Terrace Ductwork Insulation and Replacement
Renovation
Sub-Bidding
$1,419,000 CJ est. value
Grafton, WV 26354

Open-End contract for HVAC Preventive / Corrective Maintenance
Term Contract
Sub-Bidding
Malden, WV 25306

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Boiler Repairs - Salem Correctional Center and Jail
Results
$170,060 est. value
WV

Potomac State Lough Gymnasium Air Conditioning
Results
Morgantown, WV

HVAC Upgrades / Replacements - RCEDA Building
Renovation
Sub-Bidding
$190,000 CJ est. value
Spencer, WV 25276

Request for Quotations #51000 HVAC System Maintenance at WVNET
Renovation, Term Contract
Post-Bid
Morgantown, WV 26505

Chiller Repairs, Annual Preventive, and Corrective Maintenance
Term Contract
Results
Logan, WV 25601

Provide & Install a New Gas Boiler in the Kanawha County Courthouse
Renovation
Sub-Bidding
$600,000 CJ est. value
Charleston, WV 25302

HVAC Maintenance Services
Post-Bid
Morgantown, WV

HVAC Maintenance
Term Contract
Results
Charleston, WV 25302

Phase III of a New HVAC System at the Fayette County Judicial Annex
Alteration
Post-Bid
Fayetteville, WV

Last Updated 08/04/2022 04:15 PM
Project Title

Fayette County Schools Various Projects - Esser Fund Projects - Midland Trail High School Gymnasium HVAC Replacement

Physical Address View project details and contacts
City, State (County) Hico, WV 25854   (Fayette County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Athletic Facility, HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $815,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed bids for the various projects outline below are being received by the Owner, Fayette County Schools, After opening, the bids will be compared as to quality, thoroughness, and cost by the Fayette County Board of Education, and its Architect, McKinley Architecture + Engineering. The projects consist of separate funding sources, as indicated below. These funding sources have requirements for funding segregation in addition to other varying requirements stipulated in the Bidding Documents. The work of county funded projects is funded in part by the Fayette County Schools under their requirements. The Work of ESSERF funded projects is partially funded by the Elementary and Secondary School Emergency Relief (ESSER) Federal Funding Grant and subject to those requirements. In general, the scope of work is as follows: ESSER FUND PROJECTS, bid as separate packages: Outdoor Classrooms: In general, the work of this bid package consists of installing of new outdoor classrooms at various schools. The classrooms consist of pressure treated lumber frame on a concrete slab. The roof is T&G decking covered with EPDM membrane. Skylights provide daylight into the classrooms. Oak Hill High School Gymnasium HVAC Replacement: The Owners contractor will provide and install a new HVAC system including the equipment, ductwork, HVAC controls and final hookup of electrical and plumbing provided by others. Midland Trail High School Gymnasium HVAC Replacement: The Owners contractor will provide and install a new HVAC system including the equipment, ductwork, HVAC controls and final hookup of electrical and plumbing provided by others. COUNTY FUND PROJECTS, bid as separate packages: Valley PK-8 Roof Replacement: In general, the work of this bid package includes demolition of the existing roofing, install new roofing and insulation. New gutters and downspouts, retrofit roof drains and roof accessories. Oak Hill High School Gymnasium Fixtures: Gym Remodeling including, removal and replacement of wall and ceiling mounted items. New installation of backboards, hoops and pads and new gym separation curtain. Midland Trail High School Gymnasium Fixtures: Gym Remodeling including, removal and replacement of wall and ceiling mounted Gym Fixtures. New installation of backboards, hoops and pads and new gym separation curtain. Oak Hill High School General Trades: The contractor will perform all work related to the demolition of items and finishes not specifically called our to be demolished in other packages. Providing and installing new finishes, fixtures and equipment not specifically identified in other packages. Items to be included in this package are new doors, frames and hardware, new wall and ceiling finishes. Additional steel required for the support of devices and equipment shall be provided and installed by the general trade's contractor. New electrical devices, provide power to devices that will be installed by others including but not limited to bleachers, retractable basketball hoop support structures, scoreboards, AV systems and HVAC systems. New lights and fire alarm devices. Plumbing and electrical for new electric water cooler. Provide power and plumbing tot he new HVAC system to be provided by others. Midland Trail High School General Trades: The contractor will perform all work related to the demolition of items not specifically called out to be demolished in other packages. Providing and installing new finishes, fixtures and equipment not specifically identified in other packages. Items to be included in this package are new doors, frames and hardware, new wall and ceiling finishes. Additional steel required for the support of devices and equipment shall be provided and installed by the general trade's contractor. New electrical devices, provide power to devices that will be installed by others including but not limited to bleachers, retractable basketball hoop support structures, scoreboards, AV systems and HVAC systems. New lights and fire alarm devices. Plumbing and electrical for new electric water cooler. Provide power and plumbing to the new HVAC system to be provided by others. Electronic Copies of the Bidding Documents will be available as early as July 8, 2022 from the office of the Architect, McKinley Architecture + Engineering, The Maxwell Center, Suite 100, 32-20th Street, Wheeling, WV 26003, telephone 304-233-0140; Bidding Documents are being issued in electronic format (PDF) only and will be sent by the Architect to interested parties via email ShareFile download only, upon payment of a non-refundable document access fee of $50.00. Only full sets of Bidding Documents will be issued by the Architect. With payment of the $50.00 document access fee, the interested party will also be listed by the Architect as a registered bidding document holder. Bidding Document requests for information, substitution requests and correspondence shall be submitted in writing and directed to the Architect, email projects@mckinleydelivers.com. Addenda will be issued by the Architect to registered bidding document holders only, who will automatically receive all addenda in electronic format (PDF) vie ShareFile. Additional reproduced paper copies of the initially issued Bidding Documents and any subsequent addenda are also available from the Architect upon request by registered bidding document holders only, and upon payment of a non-refundable cost; contact the Architect for further information. MANDATORY Pre-Bid Meetings will be held beginning at 9 am local prevailing time on JULY 20, 2022, for the purpose of familiarizing Bidders with bidding requirements and to consider questions regarding the Bidding Documents. All potential Bidders are required to attend. Potential sub-bidders and material suppliers are also encouraged to attend. The meeting times and locations are as follows: 9:00 am at Valley PK-8 School, 1 Greyhound Lane, Smithers, WV 25186 10:00 am at Midland Trail High School, 26719 Midland Trail, Hico, WV 25854 11:00am at Outdoor Classrooms at Fayetteville PK-8 School, 515 W. Maple Ave, Fayetteville, WV 25840 12:00 pm at Oak Hill High School, 350 W Oyler Ave, Oak Hill, WV 25901. Bid Bonds executed by the Bidder and issued by a surety company approved by and in favor of the Owner, the Ohio County Board of Education, n the amount equal to five percent (5%) of the Bid, shall be submitted with each Bid, to guarantee the Bidder's entrance into a Contract, if given the award. No accepted Bid(s) shall be waived or returned because the Bidder(s) failed to, or cannot comply with, the requirements as set forth in Bidding Documents. Further, the successful bidder(s) will be required to furnish and pay for a satisfactory 100% Performance and Labor and Material Payment Bonds(s) in the amount of the contract price. Bids may not be withdrawn for a period of ninety (90) days without the consent of the Owner. Bidders and sub-bidder(s) as Contractor and Subcontractor(s) are required to utilize "local labor" pursuant to Chapter 21-Article 1C, the "West Virginia Jobs Act." Pursuant to Chapter 21-Article 11 of the "West Virginia Contractor Licensing Act" of 1991, ll Contractors doing business in West Virginia must be licensed to perform work in the State; the Contractor's WV License number must be affixed to submitted construction bids and fully executed and binding construction contractors or agreements. The work of the projects that is subject to compliance with the following Federal requirements as further stipulated in the Bidding Documents: 1) Davis Bacon Act. (40 U.S.C. 3141 3144, and 3146 3148); 2) The Equal opportunity cause provided under 41 CFR 60 1.4(b), contractors will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin; 3) The Contract Work Hours and Safety Standards Act (40 U.S.C 3701 3708); the Clean Air Act (42 (U.S.C. 7401 7671Q); the Federal Water Pollution Control Act (33 U.S.C. 1251 1387; Byrd Anti Lobbying Amendment (31 U.S.C. 1352); and section 6002 of the Solid Waste Disposal Act; and 4) As appropriate and consistent with law and to the greatest extent possible the Domestic Preferences for Procurements (2Cfr 200.323) and Small and Minority Businesses, Women's Business Enterprises, and labor Surplus Area Firms (2 Cfr 200.321) are preferred; 5) Contract award (see 2 CFR 180.220) will not be made to parties listed on the government wide exclusions in the System for Award Management (SAM). To the extent permitted by state law, the Owner reserves the right to reject any and all bids, and to make selections from the bids that are solely in its own best interest.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents