Similar Projects
Reported | 06/26/2020 12:00 AM |
Project Title | Airline Terminal Fire Alarm System Upgrade at Manchester-Boston Regional Airport |
Physical Address | View project details and contacts |
City, State (County) | Manchester, NH 03103 (Hillsborough County) |
Category(s) | Single Trades |
Sub-Category(s) | Fire Protection |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $1,500,000 to $2,200,000 |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project will provide either modification and technology upgrade or replacement of the existing Edwards/EST "IRC-3" fire alarm system that currently serves the main terminal building at the Airport. The base bid work will include replacement of existing fire alarm control equipment with new equipment panels which are compatibly-listed for use with the existing field devices and wiring that will remain. An allowable alternative approach would permit replacement of all existing EST equipment and field devices with that of an acceptable alternate manufacturer. Upon completion of the work, the complete modified system will be subject to acceptance testing by the installing contractor and system supplier in accordance with NFPA 72 requirements and as directed by the local Authorities Having Jurisdiction. The contractor must maintain an active fire alarm system during the upgrade or replacement. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |