Similar Projects
Rockford Beach - Engineered / Asphalt Drive/ Parking - Jefferson County
Infrastructure
Conception
$250,000 CJ est. value
Hillsboro, MO 63050

Heartland Residential
New Construction, Infrastructure
Design
$137,000,000 CJ est. value
Hillsboro, MO 63050

Asphalt Repair at Sherwood Elementary
Infrastructure
Design
$60,000 CJ est. value
Arnold, MO 63010

Allen Road Bridge Over Sandy Creek
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Hillsboro, MO 63050

Boyd Street Sidewalk Improvements
Infrastructure
Bidding
$450,000 CJ est. value
De Soto, MO 63020

Phase I - Center Redevelopment Welcome and Wellness Center
Demolition, New Construction, Infrastructure - 24,100 SF
Post-Bid
$10,000,000 CJ est. value
Saint Louis, MO 63120

Phase I - Center Redevelopment Welcome and Wellness Center
Demolition, New Construction, Infrastructure - 24,100 SF
Post-Bid
$10,000,000 CJ est. value
Saint Louis, MO 63120

Site Improvement Plans for Festus Commons
Infrastructure
Results
$700,000 est. value
Festus, MO

Sycamore Lane Bridge Replacement
Demolition, New Construction, Infrastructure
Results
$853,508 CJ est. value
Byrnes Mill, MO 63025

Arnold Campus: Addition & Renovation Community College District of Jefferson County
Addition, Demolition, Infrastructure - 5,311 SF
Construction
$4,415,000 CJ est. value
Arnold, MO 63010

O'Reilly Auto Parts (HBR) #6659 / Hillsboro
New Construction, Infrastructure - 7,225 SF
Construction
$400,000 CJ est. value
Hillsboro, MO 63050

James Hardie Manufacturing Facility
Demolition, New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Festus, MO 63028

Open Door Animal Sanctuary Welcome Center
New Construction, Infrastructure
Pending Verification
$255,000 CJ est. value
House Springs, MO 63051

Forced Main Extension at Festus R-6 Transportation Department
Infrastructure
Design
$2,000,000 CJ est. value
Festus, MO 63028

New Veterinary Technology Clinic Project
New Construction, Infrastructure
Bidding
$250,000 CJ est. value
Hillsboro, MO 63050

Last Updated 10/16/2023 07:32 AM
Project Title

Bayshore Subdivision Water Main Replacement

Physical Address View project details and contacts
City, State (County) Arnold, MO 63010   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $4,370,326 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bayshore Subdivision Water Main Replacement Site Directions: Along Telegraph Road from Causeway Drive to Bayshore Parkway Replacement of approximately 14,300 feet of existing water main with new 6-inch and 8-inch main in the entire Bayshore Subdivision and along Telegraph Road from Causeway Drive to Bayshore Parkway.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents