Similar Projects
STH 146 - STH 73 - Const Ops/ Bridge Reconstruction
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Poynette, WI 53955

STH 146 - STH 73 - Const Ops/ Bridge Reconstruction
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Poynette, WI 53955

Business Park Road Manufacturing Development / Wisconsin Dells
Addition, Demolition, Infrastructure - 9,600 SF
Design
$1,036,800 CJ est. value
Wisconsin Dells, WI 53965

Lodi - Baraboo Const / Mill and Overlay
Infrastructure
Bidding
$3,999,999 CJ est. value
Lodi, WI 53555

Lodi - Baraboo Const / Mill and Overlay
Infrastructure
Bidding
$3,999,999 CJ est. value
Lodi, WI 53555

Columbia County Road Improvements
Renovation
Post-Bid
Columbus, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Unke Road Improvements
Renovation, Alteration
Results
$150,000 est. value
Lodi, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

The View Porte Cochere and Cold Storage Ramp Addition
Addition, Demolition, Infrastructure
Pending Verification
$300,000 CJ est. value
Wisconsin Dells, WI 53965

Kwik Trip Store #808 Rebuild / Columbus
Demolition, New Construction, Infrastructure - 10,984 SF
Pending Verification
$2,000,000 CJ est. value
Columbus, WI 53925

Town of Scott, Inglehart Road - Construct Ops/ Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Cambria, WI 53923

Valley Hill Culvert Replacement Project
Infrastructure
Bidding
$516,000 CJ est. value
Columbus, WI 53925

Last Updated 04/10/2023 12:20 PM
Project Title

Commercial Avenue and Stand Rock Road Reconstruction

Physical Address View project details and contacts
City, State (County) Wisconsin Dells, WI 53965   (Columbia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,414,444 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: Replacement of approximately 2,100 feet of City utilities, reconstruction of approximately 4,500 centerline feet of urban roadway existing surface removals, excavation and roadway grading, sanitary sewer, water main, storm sewer, concrete curb and gutter, concrete flatwork, concrete sidewalk, concrete multi-use path, electrical conduit, associated lighting, asphalt paving, pavement markings, and signing. The anticipated substantial completion date is October 15, 2023, and anticipated final completion date is November 1, 2023. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 1230 South Boulevard, Baraboo, WI 53913. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents