Similar Projects
Burning Hearts Church Townhomes
New Construction - 21,122 SF
Design
$1,000,000 to $5,000,000 CJ est. value
West Fargo, ND 58078

Mas Tequila Restaurant And Bar
New Construction - 3,798 SF
Design
$500,000 to $1,000,000 CJ est. value
West Fargo, ND 58078

Structure Demolition and Site Restoration
Demolition
Bidding
Minot, ND

Yard Waste Drop Site Improvements
Bidding
$357,145 est. value
Grand Forks, ND

Target #T0085 - Cafe Remodel
Renovation - 1,100 SF
Post-Bid
Minot, ND 58701

Target #T1783 - Cafe Remodel
Renovation - 1,100 SF
Post-Bid
Grand Forks, ND 58201

RRVWSP – MRIPS Wet Well and Site Development
Results
$3,000,000 to $4,000,000 est. value
Carrington, ND

Fuel Station Installation
New Construction
Results
$200,000 est. value
Minot, ND

Mechanical, Fire Sprinkler, Electrical at United Way Center for Opportunity
Renovation
Construction
Bismarck, ND 58501

Sierra Townhomes
New Construction - 187,018 SF
Design
$10,000,000 CJ est. value
West Fargo, ND 58078

507 Railroad Avenue Site Restoration
Bidding
$539,000 est. value
Ray, ND 58849

2021 Exploratory Drilling AML
Term Contract
Post-Bid
$200,000 est. value

Boulevard Square III - Phase 1
New Construction - 11,048 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fargo, West Fargo, ND 58103

Landfill Fuel Station
New Construction
Bidding
Watford City, ND

2021 Beulah/Zap Phase 16 AML
Post-Bid
Beulah, ND

Last Updated 02/05/2021 02:23 PM
Project Title

Pinnacle Express Service Center

Physical Address View project details and contacts
City, State (County) Minot, ND 58701   (Ward County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Car Wash, Food/Beverage Service, Gas Station, Site Development
Contracting Method Owner to Subcontract.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

10,800 SF - Car Wash, 1,500 SF New Construction, 1 Drive-thru, Gas Station, 7,000 SF New Construction, 1 Drive-thru, 16 Fuel Pump(s), Food/Beverage Service, 2,300 SF New Construction, 1 Drive-thru, Site Development, 110,642 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents