Similar Projects
Last Updated | 01/26/2021 03:38 PM |
Project Title | U009--Sources sought - SwissLog Pneumatic Tube System Onsite Training at the MIlwaukee VAMC |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53295 (Milwaukee County) |
Category(s) | Single Trades |
Sub-Category(s) | Conveying Systems |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor shall provide two days of on-site Swisslog CTS 30 Pneumatic Tube System (PTS) Training for up to 12 Facilities Maintenance (FM) personnel at the Clement J. Zoblocki VAMC. The Contractor shall provide all labor, equipment, materials, transportation, supervision, quality control, and management necessary to accomplish the deliverables as described in this statement of work (SOW). Contractor shall provide: A. A brief Swisslog CTS 30 Pneumatic Tube System (PTS) overview module. (Utilizing no more than 20% of total class time.) B. A training module on operational problems and system faults. (30%+ of total class time.) C. A training module on troubleshooting. (30%+ of total class time.) D. A brief module on periodic maintenance. (Utilizing no more than 20% of total class time.) E. Their own laptop containing the PTS Training. This laptop will be plugged into a VAMC classroom projector. F. An electric .pdf file of all non-proprietary training materials used in the class to VA Medical Center’s Point of Contact (POC), within three days of class completion. G. A minimum of four (4) on-equipment training scenario exercises, demonstrating common/probable system faults, and necessary troubleshooting, using one of the five zones (risers) on the VA Medical Center’s pneumatic tube system, if such can be accomplished without adverse impact to tube system traffic in the four remaining zones. If such cannot be accomplished, provisions will be made in advance by the Contractor to have ready and provide an alternative agenda to fill the allotted time focusing on common/probable PTS operational problems/faults and troubleshooting (items B and C above) using classroom scenarios. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |