Similar Projects
Request for Qualifications - Engineering, Planning and Developement
Post-Bid
Raleigh, NC 27623

Wilmington International Airport - Hurricane Florence Repairs and Maintenance
Post-Bid
Wilmington, NC 28405

General Aviation Terminal
Results
Lumberton, NC 28358

Fayetteville Regional Airport Airline Terminal Improvements Part 2 Project
Results
Fayetteville, NC 28306

Terminal 2 Security Checkpoint Expansion
Construction
$1,200,000 est. value
Raleigh, NC

Terminal Improvements - Contract 1
Construction
Wilmington, NC

Construction Management at Risk Services - Concourse A Expansion Phase 2
Post-Bid
Less than $165,000,000 est. value
Charlotte, NC 28208

Concourse E Expansion Phase 9
Results
Charlotte, NC

Terminal Improvements - Contract 2
Construction
Wilmington, NC 28401

Centralized Receiving and Distribution Center
New Construction - 55,000 SF
Post-Bid
Charlotte, NC

Jacksonville Station
New Construction - 15,000 SF
Results
$8,000,000 to $10,000,000 est. value
Jacksonville, NC

New Terminal Building
New Construction
Construction
Aulander, NC 27805

Construct General Aviation/Fixed Base Operation Services and Facilities
- 23,200 SF
Post-Bid
Wilmington, NC

Terminal Improvements Contract 3
Construction
Less than $40,000,000 est. value
Wilmington, NC 28401

Cargo 7 - Field Maintenance and Airside Operations
Post-Bid
Charlotte, NC

Last Updated 04/08/2019 10:05 AM
Project Title

Terminal 1 Gates A1-A4 Activation

Physical Address View project details and contacts
City, State (County) Morrisville, NC 27560   (Wake County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method
Project Status Construction Commenced March 2019, Construction Completion Expected April 2020
Bids Due View project details and contacts
Estimated Value $8,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Demolition, General Trades, Concrete, Precast, Masonry, Miscellaneous Metals, Millwork, Framing and Drywall, Painting, Thermal and Moisture Protection, Doors and Hardware, Ceilings, Flooring, Signage, Fire Suppression, Mechanical, Plumbing, Electrical, Baggage Handling Unit, and Jet Bridge contractors to submit bids for the furnishing of labor, material, and equipment for the following project: RDU Terminal 1 Gates A1-A4 Activation.
Details
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents