Similar Projects
Reported | 06/12/2021 12:00 AM |
Project Title | Groundwater Monitoring Project |
Physical Address | View project details and contacts |
City, State (County) | (Martin, Palm Beach, Saint Lucie Counties) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Beginning in the 3rd quarter of 2021, the contractor will sample the twenty-five (25) monitoring wells located on the subject sites on a quarterly basis for three (3) years. The sampling will be conducted under Florida Department of Environmental Protection, Standard Operating Procedures (FDEP-SOP001/01), FS-2200 for groundwater sampling. The sampling analysis will consist of chloride, pH, TDS, and turbidity. Samples are to be collected via peristaltic pump. A field sampling data sheet will be prepared for each well sampled that will include depth to water and a calculation of well volume for purging. One field equipment blank and one duplicate sample will be taken during each quarterly sampling round in order to meet Quality Assurance/Quality Control (QA/QC) requirements. Each sample will be analyzed by a state certified testing laboratory in accordance with the following: EPA Method 300 for dissolved chloride, EPA Method 150.1 for pH. EPA Method 160.1 for TDS, and EPA Method 180.1 for turbidity. A Chain of Custody form will be completed properly identifying sample locations, sample type, sampler. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |