Similar Projects
College of Nursing
New Construction
Conception
$10,000,000 est. value
Bozeman, MT 59717

Spring Creek Park Subdivision
New Construction
Conception
Kalispell, MT 59901

Phase 1 Collection System Rehabilitation
Infrastructure
Design
$1,950,000 CJ est. value
Glendive, MT 59330

2022 North 7th Avenue Water Renovations
Infrastructure
Design
$427,000 CJ est. value
Bozeman, MT 59715

Blackfeet Reservation Apartment Complex
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Browning, MT 59417

St. Ignatius School District - Gym and Shop Addition
Addition, Demolition, Infrastructure - 3,517 SF
Bidding
$1,725,000 CJ est. value
Saint Ignatius, MT 59865

HVAC Upgrades Donaldson Building
Renovation
Sub-Bidding
$1,587,000 CJ est. value
Helena, MT 59601

Well Drilling
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Crow Agency, MT 59022

Sluice Boxes State Park Upper Trailhead Parking Improvements
New Construction
Post-Bid
$44,000 est. value
Belt, MT 59412

Gallagher Classroom 106 Renovations
Renovation
Post-Bid
Missoula, MT

Groundwater Wells
Infrastructure
Results
$277,200 est. value
Helena, MT 59602

Lewis & Clark Caverns Buildings Re-Roof Project
Renovation, Alteration
Results
$150,000 est. value
Whitehall, MT 59759

Montana College of Osteopathic Medicine
New Construction - 135,000 SF
Construction
$78,600,000 est. value
Billings, MT 59106

Taft Stockpile Site - Sand/Salt Cover Structure
New Construction, Infrastructure
Construction
$310,000 CJ est. value
Taft, MT 59867

Off-Campus Living Center
Renovation
Pending Verification
Bozeman, MT 59715

Last Updated 07/29/2022 01:05 PM
Project Title

Improvements to Existing Intercollegiate Student-Athletic Support Areas-Washington-Grizzly Stadium and the Adams Center

Physical Address View project details and contacts
City, State (County) Missoula, MT 59812   (Missoula County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2020
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

If you need more information on this event, please contact: Bob Warfle +1 406-444-0771 RWarfle@mt.gov The overall project consists of multiple phases that include men's basketball, women's basketball, volleyball and track locker rooms and an athletic equipment center. This project will utilize the space vacated by the opening of the new Champions Center to make much needed facility improvements of the student-athlete support areas within Intercollegiate Athletics. The project will be done in phases as each phase opens up new space needed for the next phase. This project is for Phase 2, the architect appointed may be retained to complete the remaining phases. Phase 1 will repair and renovate the exterior envelope. (underway) Phase 2 will construct a new men's basketball locker room and install infrastructure for a new Equipment Room. Phase 3 will relocate the Hackney Athletic Equipment Center into the old football locker room. Phase 4 will construct new womens basketball, volleyball and track locker room facilities that are comparable to those proposed for the men. Firms applying for this project should also highlight their athletic facilities experience. Interviews are anticipated to be scheduled about mid-September with an appointment by the end of September. For additional information, please contact Kevin Krebsbach, Facilities Director at the University of Montana, (406) 243-2095, kevin.krebsbach@umontana.edu or Bob Warfle, Engineering Manager for the A&E Division, (406) 444-0771, bwarfle@mt.gov. Question Submission Close Date:8/15/2019 2:00 PM MDT Will be given project-specific initial information, interview topics/questions, and the interview schedule. Will be asked to present their credentials before an interview committee. The committee will then submit the names of three (3) qualified firms to the Dept. of Administration Director, who will appoint one firm for each project in accordance with 18-2-112 MCA.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Selective Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents