Last Updated | 11/14/2022 02:37 PM |
Project Title | Whole Home Interior Painting of Residence |
Physical Address | View project details and contacts |
City, State (County) | Phelps, NY 14532 (Ontario County) |
Category(s) | Single Trades |
Sub-Category(s) | Painting |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $70,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Finger Lakes DDSO is soliciting bids for a Whole Home Interior Painting at our Eagle IRA. This is a NYS public works project and prevailing wages must be paid. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 30% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 30 days after completion of project SCOPE OF WORK includes, but is not necessarily limited to the following: Complete Interior painting of residence; Walls, Ceilings, Closets, Doors, Base and Trim, etc. 1. Price quote shall include all materials (paint, stain, necessary tools and accessories) and labor. 2. Paint, stain and other finishes must be a SHERWIN WILLIAMS product selected from the DDSO color chart by House Director or Maintenance Supervisor/Designee. The colors chosen for common areas (kitchen, dining, rec rooms, hallways, etc.) must be neutral colors. 3. House accessibility to be determined by House Director. 4. Remove furniture as required and return to place when job is complete. 5. Disconnect/Remove appliances as required and return/re-connect when job is complete. 6. Removal all pictures, outlet and switch covers and return to place when job is complete. 7. Remove all electronics if needed and return/re-connect to place when job is complete. 8. Imperfections (eg: Holes gouges, and dings) on wall and ceiling surfaces shall be filled with a proper spackling compound. Then sanded smooth and primed before a top coat to prevent flashing. 9. Clean and prepare surfaces to be painted per the manufacturer's written instructions for each substrate condition and as specified. The is to include wall paper and sizing removal and spackling of all damaged wall surfaces prior to painting. All surfaces must be sanded after patching to match existing surface to ensure invisible repairs then primed before applying topcoat. 10. Paint used in bathrooms shall include a mold inhibitor. 11. Ceiling paint shall be a flat finish, except in Bathrooms/Kitchens where a semi-gloss finish should be used. 12. Paint used on walls and trim must be a semi-gloss finish. 13. A clear satin low VOC coating to be applied to all-Natural Wood trim and doors if needed. 14. Any stains on ceilings and walls shall be primes, with a satin killing primer to prevent bleed-through of topcoat. 15. All surfaces shall have two (2) coats of paint minimum; three (3) or more if necessary, for complete coverage, same for varnish's if applicable. 16. Apply paints and stains by brush and roller only, per the manufacturer's written instructions. Use primer as recommended by manufacturer. 17. Use drop cloths to cover stationary furniture, flooring, appliances, etc. 18. See attached floor plan for work that needs to be addressed on a room-to-room basis. 19. Sprinkler heads, fire alarm pull stations, smoke detectors, and heat detectors must be free of any paint when the job is complete. 20. Remove and dispose of any empty cans, rags, rubbish, masking and other rubbish materials at the end of each work day. 21. Clean glass and paint spattered surfaces by scraping and washing. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |