Similar Projects
Town Hall Exterior Painting
Renovation
Design
$200,000 CJ est. value
Conesus, NY 14435

Pavement Markings
Infrastructure
Sub-Bidding
$3,514,300 CJ est. value
Hilton, NY 14468

Pavement Markings
Infrastructure
Sub-Bidding
$3,650,000 CJ est. value
Orchard Park, NY 14127

Filter Plant Roof Painting
Post-Bid
Elmira, NY 14901

Painting Services at Albany International Airport
Alteration
Post-Bid
Albany, NY

Winchester Painting Services
Term Contract
Results
Buffalo, NY 14224

Regional Bridge Painting Project and Minor Steel Repairs
Alteration
Results
$2,300,000 est. value

Pavement Marking
Term Contract
Sub-Bidding
North Hempstead, NY 11050

Painter Services
Post-Bid
Binghamton, NY

SMD Services Maintenance Painting
Alteration
Results
New York, NY 10029

Belmont Painting
Term Contract
Sub-Bidding
Elmont, NY 11003

Interior and Exterior Painting - CD21002 Albany Street, CD21012 Broadway, CD 21034 Keyes Painting
Alteration
Post-Bid
Schenectady, NY 12304

Maintenance Painting of Apartmnents
Alteration
Results
New York, NY 10027

Standby Pavement Markings
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Batavia, NY 14020

Campus Painting
Alteration
Post-Bid
Troy, NY

Last Updated 11/14/2022 02:37 PM
Project Title

Whole Home Interior Painting of Residence

Physical Address View project details and contacts
City, State (County) Phelps, NY 14532   (Ontario County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Finger Lakes DDSO is soliciting bids for a Whole Home Interior Painting at our Eagle IRA. This is a NYS public works project and prevailing wages must be paid. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 30% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 30 days after completion of project SCOPE OF WORK includes, but is not necessarily limited to the following: Complete Interior painting of residence; Walls, Ceilings, Closets, Doors, Base and Trim, etc. 1. Price quote shall include all materials (paint, stain, necessary tools and accessories) and labor. 2. Paint, stain and other finishes must be a SHERWIN WILLIAMS product selected from the DDSO color chart by House Director or Maintenance Supervisor/Designee. The colors chosen for common areas (kitchen, dining, rec rooms, hallways, etc.) must be neutral colors. 3. House accessibility to be determined by House Director. 4. Remove furniture as required and return to place when job is complete. 5. Disconnect/Remove appliances as required and return/re-connect when job is complete. 6. Removal all pictures, outlet and switch covers and return to place when job is complete. 7. Remove all electronics if needed and return/re-connect to place when job is complete. 8. Imperfections (eg: Holes gouges, and dings) on wall and ceiling surfaces shall be filled with a proper spackling compound. Then sanded smooth and primed before a top coat to prevent flashing. 9. Clean and prepare surfaces to be painted per the manufacturer's written instructions for each substrate condition and as specified. The is to include wall paper and sizing removal and spackling of all damaged wall surfaces prior to painting. All surfaces must be sanded after patching to match existing surface to ensure invisible repairs then primed before applying topcoat. 10. Paint used in bathrooms shall include a mold inhibitor. 11. Ceiling paint shall be a flat finish, except in Bathrooms/Kitchens where a semi-gloss finish should be used. 12. Paint used on walls and trim must be a semi-gloss finish. 13. A clear satin low VOC coating to be applied to all-Natural Wood trim and doors if needed. 14. Any stains on ceilings and walls shall be primes, with a satin killing primer to prevent bleed-through of topcoat. 15. All surfaces shall have two (2) coats of paint minimum; three (3) or more if necessary, for complete coverage, same for varnish's if applicable. 16. Apply paints and stains by brush and roller only, per the manufacturer's written instructions. Use primer as recommended by manufacturer. 17. Use drop cloths to cover stationary furniture, flooring, appliances, etc. 18. See attached floor plan for work that needs to be addressed on a room-to-room basis. 19. Sprinkler heads, fire alarm pull stations, smoke detectors, and heat detectors must be free of any paint when the job is complete. 20. Remove and dispose of any empty cans, rags, rubbish, masking and other rubbish materials at the end of each work day. 21. Clean glass and paint spattered surfaces by scraping and washing.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents