Similar Projects
Last Updated | 10/10/2023 01:33 AM |
Project Title | Paving and Drainage Improvements to CR 3344 |
Physical Address | View project details and contacts |
City, State (County) | Tyler, TX 75702 (Smith County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,800,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project shall consist of furnishing all necessary materials, machinery, equipment, superintendence, and labor for the Paving and Drainage Improvements to CR 3344 (From CR 336 to S.H. 155) for Smith County, Texas. Smith County reserves the right to accept or reject in whole or in part any bid received and to waive any irregularities or formalities in the best interest of Smith County. A Bid Bond is required for this project. Question Deadline 10/19/2023 at 5:00 PM CT Any prospective bidder desiring any explanation or interpretation of the solicitation must make a written request. The request must be addressed to Jaye Latch, County Purchasing Director and emailed to purchasing@smith-county.com. The improvements for this project shall consist of the following work items and/or categories. This description may not include all the work items that are required for this project, whether the items are paid or subsidiary to pertinent items. The project provides for the construction of a new 30-ft. wide county road (Length = 8346 feet), with 40-ft. wide intersection flares, with cement treated subgrade, HMAC base, and HMAC surface, and the installation of storm sewer and drainage crossing structures, installation of utility casings at crossings, with pavement markings, and all necessary appurtenances. The project also includes the installation of a deceleration lane along SH 155 with cement treated subgrade, HMAC base, one course surface treatment, and HMAC surface. The project is located on a new alignment which will allow the road to be closed to public access during the construction of the project. The construction of the deceleration lane along SH 155 will require a traffic control plan and traffic to be maintained throughout the duration of the project. The construction of the intersection at CR 336 and the I-20 Frontage Road will require a traffic control plan and traffic to be maintained, except during critical work items. Closure of the I-20 Frontage Road roadway for critical work items shall be allowed but limited as much as possible. Contractor shall notify affected property owners prior to such closures. Final cleanup of all work areas shall be made prior to final acceptance of the project. Prospective Bidders are expected to inspect the site of work and to inform themselves regarding all local conditions. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |