Similar Projects
2022 Bond - Proposition A - Winona Independent School District
Addition, Renovation, Infrastructure
Conception
$13,400,000 CJ est. value
Winona, TX 75792

Shiloh Road Multi-Residential
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Tyler, TX 75703

Hospitality Health ER Expansion
New Construction, Infrastructure - 26,000 SF
Design
$2,500,000 CJ est. value
Tyler, TX 75701

Hospitality Health ER Expansion
New Construction, Infrastructure - 26,000 SF
Design
$2,500,000 CJ est. value
Tyler, TX 75701

RFQ Construction Manager at Risk - UT Tyler Science Building
Addition, Demolition, New Construction, Renovation, Infrastructure - 150,000 SF
Bidding
$90,000,000 CJ est. value
Tyler, TX 75708

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Road Improvements to CR 1284
Infrastructure
Results
$557,251 est. value
Flint, TX 75762

Roadway Improvements to CR 1145
Infrastructure
Results
$255,543 est. value
TX

Medical Education Building - UT Tyler Health Science Center
New Construction, Infrastructure - 250,000 SF
Construction
$220,850,000 CJ est. value
Tyler, TX 75701

Medical Education Building - UT Tyler Health Science Center
New Construction, Infrastructure - 250,000 SF
Construction
$220,850,000 CJ est. value
Tyler, TX 75701

DK Convenience Store
New Construction, Infrastructure - 4,100 SF
Pending Verification
$2,000,000 CJ est. value
Tyler, TX 75702

DK Convenience Store
New Construction, Infrastructure - 4,100 SF
Pending Verification
$2,000,000 CJ est. value
Tyler, TX 75702

Career and Technical Education Facility Chapel Hill High School - 2023 Bond - Chapel Hill Independent School District
New Construction, Infrastructure
Conception
$19,938,000 CJ est. value
Tyler, TX 75707

Wayfare Apartments / Leasing Office
New Construction, Infrastructure - 374,850 SF
Design
$36,559,544 CJ est. value
Tyler, TX 75703

Last Updated 10/10/2023 01:33 AM
Project Title

Paving and Drainage Improvements to CR 3344

Physical Address View project details and contacts
City, State (County) Tyler, TX 75702   (Smith County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $5,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall consist of furnishing all necessary materials, machinery, equipment, superintendence, and labor for the Paving and Drainage Improvements to CR 3344 (From CR 336 to S.H. 155) for Smith County, Texas. Smith County reserves the right to accept or reject in whole or in part any bid received and to waive any irregularities or formalities in the best interest of Smith County. A Bid Bond is required for this project. Question Deadline 10/19/2023 at 5:00 PM CT Any prospective bidder desiring any explanation or interpretation of the solicitation must make a written request. The request must be addressed to Jaye Latch, County Purchasing Director and emailed to purchasing@smith-county.com. The improvements for this project shall consist of the following work items and/or categories. This description may not include all the work items that are required for this project, whether the items are paid or subsidiary to pertinent items. The project provides for the construction of a new 30-ft. wide county road (Length = 8346 feet), with 40-ft. wide intersection flares, with cement treated subgrade, HMAC base, and HMAC surface, and the installation of storm sewer and drainage crossing structures, installation of utility casings at crossings, with pavement markings, and all necessary appurtenances. The project also includes the installation of a deceleration lane along SH 155 with cement treated subgrade, HMAC base, one course surface treatment, and HMAC surface. The project is located on a new alignment which will allow the road to be closed to public access during the construction of the project. The construction of the deceleration lane along SH 155 will require a traffic control plan and traffic to be maintained throughout the duration of the project. The construction of the intersection at CR 336 and the I-20 Frontage Road will require a traffic control plan and traffic to be maintained, except during critical work items. Closure of the I-20 Frontage Road roadway for critical work items shall be allowed but limited as much as possible. Contractor shall notify affected property owners prior to such closures. Final cleanup of all work areas shall be made prior to final acceptance of the project. Prospective Bidders are expected to inspect the site of work and to inform themselves regarding all local conditions.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents