Similar Projects
Reported | 01/31/2022 12:20 PM |
Project Title | Highland Beach Sidewalk Project |
Physical Address | View project details and contacts |
City, State (County) | Bridgton, ME 04009 (Cumberland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | All Bids Rejected |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Design, engineering, construction bid assistance and construction management of the Highland Beach Sidewalk Extension Project, located on Highland Road in Bridgton, ME. The Project generally consists of construction of a new 4-foot-wide concrete sidewalk with granite curbing on Highland Road from the end of existing sidewalk at Shorey Park to Kennard Street. The Project will be carried out under the Federal Community Development Block Grant program, which requires compliance with the Federal Davis-Bacon Act for the construction phase of the project. The design, engineering, construction bid documents and construction bid assistance shall be complete and construction bid award recommendations received by December 31, 2021 for a construction start in early Spring 2022. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |