Similar Projects
Last Updated | 05/19/2022 03:32 PM |
Project Title | Wilson Sanitary Sewer Line Replacement |
Physical Address | View project details and contacts |
City, State (County) | Fountain, CO 80817 (El Paso County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $150,350 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove and replace approximately 830-feet +/- of 12 dia. clay pipe with a 12 dia. PVC pipe. The proposed 12 dia. pipe has already been bought by FSD and is located at 11545 Link Road. The contractor will need to transport the pipe from FSD facility to the job site. Approximately 50-feet of roadway guardrail will need to be removed and replaced to allow for through traffic during construction. Also, during construction the contractor will be responsible for pumping raw wastewater from the upstream manhole to the nearestdownstream manhole. Grading within the intersection of Wilson and Orleans roadways will be required to allow for through traffic. Any asphalt that is removed will need to be replaced per City of Fountain requirements. Existing manholes in Wilson Road will remain, but exist and entry holes will need to be modified for the new PVC pipe. Any adjacent disturbed vegetation areas will require hydro-seeding |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |